CHAMPIONS WESTLAKE is a renovation/alteration project at 2805 BEE CAVE RD. Suite 405, Rollingwood, TX 78746, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2014). The project has an estimated value of $700K.
Project has been completed and closed
CHAMPIONS WESTLAKE is a Renovation/Alteration project located at 2805 BEE CAVE RD. Suite 405, Rollingwood, TX 78746 in Rollingwood, Texas. The project has an estimated value of $700K. REGENCY CENTERS LP is the property owner and RUNA WORKSHOP is the design firm of record. The project was registered with TDLR on October 29, 2013.
CHAMPIONS WESTLAKE is a renovation/alteration project at 2805 BEE CAVE RD. Suite 405, Rollingwood, TX 78746 in Rollingwood, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Expansion of gymnasium into adjoining space.
Construction on CHAMPIONS WESTLAKE is complete โ TDLR records show the project passed its required accessibility inspection in May 2014. The building is finished and very likely open.
CHAMPIONS WESTLAKE is located at 2805 BEE CAVE RD. Suite 405, Rollingwood, TX 78746, Rollingwood, TX, 78746, in Travis County.
REGENCY CENTERS LP is the property owner/developer of record for CHAMPIONS WESTLAKE, per its TDLR project registration.
RUNA WORKSHOP is the design firm of record for CHAMPIONS WESTLAKE, according to its TDLR filing.
CHAMPIONS WESTLAKE has an estimated construction value of $700K, based on its TDLR filing.
Expansion of gymnasium into adjoining space.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Oct 29, 2013
Review Complete
Inspection Complete
Closed
May 1, 2014
Building permits found at or near this location
This estimate outlines the scope of work required to address multiple failures in the drain system servicing the hall bathroom. Upon return Centex will perform approximately 25 feet of tunneling beneath the foundation to gain access to the damaged section of the 3 main drain line serving the hall bathroom. During initial evaluation multiple leaks were identified including two leaks on the main line and two additional leaks at the lavatory and tub drain connections indicating widespread failure of the existing drainage system. Due to the condition of the piping the recommended course of action is to fully re-pipe the hall bathroom drain system rather than attempt isolated repairs. This will ensure long-term reliability and bring the system up to current standards. All necessary piping within the hall bathroom area will be fully exposed and replaced including connections to the lavatory and tub drains as well as the affected section of the main line. Once all repairs and re-piping are completed we will: Perform a full system test to verify proper function and confirm there are no remaining leaks Coordinate and schedule required city inspection to ensure compliance with local plumbing codes
Construct new driveway approach of 12 FT. No sidewalk inspection per plan review.
2805 McCurdy St Building 9 lot 44 New 3 Story Single Family House with attached garage covered porch
2805 McCurdy St Building 8 lot 45 New 3 Story Single Family House with attached garage covered porch
New construction of 2 story SFR with 4 beds 5.5 baths new pool