Zabalist
ZabalistTexas Construction
๐Ÿ  Home
๐Ÿ“‹ Directory
๐Ÿ’Ž Pricing๐Ÿ“Š Data
Sign InCreate Account
Zabalist
ZabalistTexas Construction

The most comprehensive Texas construction intelligence platform. Search verified contractors, track permits, and explore projects across the state.

โœ“ Verified DataFree to Search

Directory

  • Contractors
  • Builders
  • Architects
  • Developers
  • Property Owners

Construction Data

  • Building Permits
  • State Projects
  • Site Plans
  • Texas RFPs & Bids
  • Browse by City
  • Browse by County

Free Tools

  • Contractor License Lookup
  • Permit Cost Estimator
  • Free Contractor Badges
  • About Zabalist
  • Contact Us

ยฉ 2026 Smart Austin LLC d/b/a Moon Sherpa Labs. All rights reserved.

TermsPrivacyCookiesDo Not SellAccessibilityDMCAData Sources
Data from verified public sources. Not affiliated with any government agency.
  1. Home
  2. /
  3. Projects
  4. /
  5. Travis
Under construction๐Ÿ“Review Complete๐Ÿ”ง Renovation/Alteration๐Ÿ’ต This project involves public funds, public land, or is a Federally funded roadway project.

DELL MEDICAL SCHOOL PHASE 1: SITE

1500 TO 1900 RED RIVER ST., Austin, TX 78712, Austin, TX, 78712
Construction50%

๐Ÿ“ŠProject Metrics

TDLR #EABPRJB4809152
$37.5M
Project Value
โ€”
Square Feet
โ€”
Cost/SqFt
3y 7mo
Duration
Registered:Feb 12, 2014
Start:Mar 1, 2014
Target:Sep 1, 2017
๐Ÿ“

Review Complete

Design review complete, construction may proceed

DELL MEDICAL SCHOOL PHASE 1: SITE is a Renovation/Alteration project located at 1500 TO 1900 RED RIVER ST., Austin, TX 78712 in Austin, Texas. The project has an estimated value of $37.5M. UNIVERSITY OF TEXAS SYSTEM is the property owner and BURY INC. is the design firm of record. The project was registered with TDLR on February 12, 2014.

๐Ÿ“‹Scope of Work

Consists of re-aligning Red River Street & utility & sidewalk improvements for the district bounded by 15th St,

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

๐Ÿ“…Compliance Timeline

Project Registered
February 12, 2014
Review Complete
February 12, 2014
Construction Start
March 1, 2014
Expected Completion
September 1, 2017

๐Ÿ“…Project Timeline

Filed

Feb 12, 2014

Review Complete

Feb 12, 2014

Inspection Complete

Closed

๐Ÿ”—Related Projects

๐Ÿ‘คSame Owner

$5.04B total
UTSA NPB Classroom Reno
San Antonioยท$430K
UTSA JPL 2nd & 3rd Floor Classroom Renovation
San Antonioยท$575K
Moet Club Expansion & Bowl Renovations
Austinยท$2.0M
UTSA BSE Sterilizer Install Rm 3.304A
San Antonioยท$425K

๐Ÿ›๏ธSame Design Firm

$93.7M total
ENCLAVE AT ESTANCIA PHASE 3
Austinยท$1.5M
PARMER 3.1 OFFICE BUILDING SITE
Austinยท$15.6M
BRAUCHLE ES DRAINAGE AND PAVEMENT IMPRV.
San Antonioยท$277K
CABLE ES PAVEMENT AND DRAINAGE IMPROV.
San Antonioยท$157K

๐Ÿ“„Related City Permits

Building permits found at or near this location

1500 RED RIVER ST

7 DAY - Replace Existing latching hardware with keypad devices AT EXISTING HOSPITAL - OVA

ActiveBuilding PermitRemodelMay 2026
View Details
2026-063080 BP
๐Ÿ”งHOAR Construction LLC
1500 AQUIFER CV

Replace main panel no meter meter can required

ActiveElectrical PermitRepairMay 2026
View Details
2026-060947 EP
๐Ÿ”งMolitor Electric, Inc.
1500 FARO DR UNIT 2624

QT - INTERIOR: Replace front door replace patio door replace bedroom door replace laundry bifold doors replace 48sqft of insulation replace 48sqft of sheetrock replace bath vanity replace bath vanity light fixture and bath ceiling light fixture replace laminate kitchen countetop replace 100lf of baseboards EXTERIOR: Replace 192sqft of underlayment replace 472 sqft of siding

ActiveElectrical PermitRemodelApr 2026
View Details
2025-157547 EP
๐Ÿ”งLP General Services Contractor
1500 FARO DR UNIT 2614

QT - INTERIOR: Replace front door replace patio door water heater closet door laundry bi-fold doors replace 394sq ft of insulation replace 394sqft of sheetrock replace 75lf of baseboards unit interior repaint resurface laminate countertops in kitchen replace 5 living room receptacles. EXTERIOR: Replace 240sqft of underlayment and siding.

ActiveElectrical PermitRemodelApr 2026
View Details
2025-158128 EP
๐Ÿ”งLP General Services Contractor
1500 SPYGLASS DR BLDG A

142 SF Prep Kitchen renovation

ActiveBuilding PermitRemodelApr 2026
View Details
2026-008893 BP
๐Ÿ”งPruneda Construction***MAIN**

Quick Actions

View on TDLR
TDLR ID: EABPRJB4809152

Property Owner

๐Ÿ‘ค
University of Texas System and Affiliates (Austin Focus)
Contact: Registered by TDLR
1055 projects ยท $5.04B
View company profile
BILL SIMPSON 201 WEST 7TH STREET, AUSTIN, TX 78701
(512) 579-5076
www.austin.utexas.edu

Design Firm

๐Ÿ›๏ธ
Bury, Inc. (Austin Operations)
98 projects ยท $93.7M
View company profile
TRAVIS FLAKE 221 WEST 6TH, SUITE 600, AUSTIN, TX 78701
(512) 328-0011

Explore Area

๐Ÿ™๏ธ
Austin
View city projects
๐Ÿ—บ๏ธ
Travis County
View county projects
๐Ÿ“ฎ
ZIP 78712
View zip code projects

Find Professionals

๐Ÿ”จ
Contractors in Austin
Licensed contractors directory
๐Ÿ—๏ธ
Builders in Austin
Home & commercial builders
๐Ÿ“
Architects in Austin
Architecture & design firms

Get alerts for Travis

Daily email when new projects start nearby.

Start Alerts - $19/mo

Download project data

Get curated lists of projects with full contact info.

Browse Data Lists
Explore All Projects