BASTROP SAFETY IMPROVEMENTS
๐Project Metrics
TDLR #EABPRJB4814385Project Closed
Project has been completed and closed
๐Scope of Work
Remove and replace 2 main backstops with motorized. Remove and replace wood gym floor. Remove existing bleacher
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$400K total๐Related City Permits
Building permits found at or near this location
New pool in-ground pool and spa with autofill/heating system. 570 sqft concrete decking w/ 104 sqft pool coping
New in-ground pool w/ spa. same pool equipment to be used from existing pool. existing wood deck to be removed
Total demolition of pool/spa 1819 sq ft circa 2014 ***The building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in Steps 5 & 6 of the Demolition webpage.***
Main service panel and pool subpanel replacement
Reconfiguration of the kitchen dining laundry and pantry area on the first floor.