Project has been completed and closed
BASTROP HIGH SCHOOL GYM RENOVATION is a Renovation/Alteration project located at 1614 CHAMBERS ST., Bastrop, TX 78302 in Bastrop, Texas. The project has an estimated value of $225K. BASTROP ISD is the property owner and PFLUGER ASSOCIATES is the design firm of record. The project was registered with TDLR on May 12, 2014.
Remove and replace 2 main backstops with motorized. Remove & Replace wood gym floor. Remove existing bleacher
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
May 12, 2014
Review Complete
Inspection Complete
Closed
Aug 1, 2014
Building permits found at or near this location
Change of use to retail liquor sales with remodel.
Change of use to retail liquor sales with remodel.
Tunnel sewer line repair underneath the foundation of the home roughly 6ft
Replacement of an existing water heater Standard 50 Gal Electric Water Heater change out 1614 Strickland Drive Austin TX 78748
Expedited Review - New construction of 2-story duplex [6bed 8bath] with one attached 1-car Garage and one attached 1-car Carport.