3RD FLOOR CORRIDOR
3RD FLOOR CORRIDOR is a renovation/alteration project at 7160 N. DALLAS PARKWAY, Plano, in Collin County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2014). The project has an estimated value of $111K.
๐Project Metrics
TDLR #EABPRJB4820498Project Closed
Project has been completed and closed
3RD FLOOR CORRIDOR is a Renovation/Alteration project located at 7160 N. DALLAS PARKWAY, Plano, TX 75024 in Plano, Texas. The project has an estimated value of $111K. KBSIII LEGACY TOWN CENTER LLC is the property owner and ENTOS DESIGN is the design firm of record. The project was registered with TDLR on August 7, 2014.
โFrequently Asked Questions
What is 3RD FLOOR CORRIDOR?
3RD FLOOR CORRIDOR is a renovation/alteration project at 7160 N. DALLAS PARKWAY in Plano, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 2,074 S.F. OF CORRIDOR AND ELEVATOR LOBBY REMODEL.
Is 3RD FLOOR CORRIDOR open in Plano?
Construction on 3RD FLOOR CORRIDOR is complete โ TDLR records show the project passed its required accessibility inspection in Oct 2014. The building is finished and very likely open.
Where is 3RD FLOOR CORRIDOR located?
3RD FLOOR CORRIDOR is located at 7160 N. DALLAS PARKWAY, Plano, TX, 75024, in Collin County.
Who is the owner or developer of 3RD FLOOR CORRIDOR?
KBSIII LEGACY TOWN CENTER LLC is the property owner/developer of record for 3RD FLOOR CORRIDOR, per its TDLR project registration.
Who is the architect or design firm for 3RD FLOOR CORRIDOR?
ENTOS DESIGN is the design firm of record for 3RD FLOOR CORRIDOR, according to its TDLR filing.
How much does 3RD FLOOR CORRIDOR cost and how big is it?
3RD FLOOR CORRIDOR has an estimated construction value of $111K, based on its TDLR filing.
๐Scope of Work
2,074 S.F. OF CORRIDOR AND ELEVATOR LOBBY REMODEL.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Aug 7, 2014
Review Complete
Inspection Complete
Closed
Oct 1, 2014