RIVER ROCK HOMES, PHASE 1
RIVER ROCK HOMES, PHASE 1 is a new construction project at 10703 1/2 BUFFALO SPEEDWAY, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Mar 2015). The project has an estimated value of $525K.
๐Project Metrics
TDLR #EABPRJB5801462Project Closed
Project has been completed and closed
RIVER ROCK HOMES, PHASE 1 is a New Construction project located at 10703 1/2 BUFFALO SPEEDWAY, Houston, TX 77036 in Houston, Texas. The project has an estimated value of $525K. BUFFALO LAKES LTD. is the property owner and BROWN & GAY ENGINEERS INC. is the design firm of record. The project was registered with TDLR on September 23, 2014.
โFrequently Asked Questions
What is RIVER ROCK HOMES, PHASE 1?
RIVER ROCK HOMES, PHASE 1 is a new construction project at 10703 1/2 BUFFALO SPEEDWAY in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: The plans are for water, sanitary, storm sewer and paving to serve a section of the 27 single family homes. The
Is RIVER ROCK HOMES, PHASE 1 open in Houston?
Construction on RIVER ROCK HOMES, PHASE 1 is complete โ TDLR records show the project passed its required accessibility inspection in Mar 2015. The building is finished and very likely open.
Where is RIVER ROCK HOMES, PHASE 1 located?
RIVER ROCK HOMES, PHASE 1 is located at 10703 1/2 BUFFALO SPEEDWAY, Houston, TX, 77036, in Harris County.
Who is the owner or developer of RIVER ROCK HOMES, PHASE 1?
BUFFALO LAKES LTD. is the property owner/developer of record for RIVER ROCK HOMES, PHASE 1, per its TDLR project registration.
Who is the architect or design firm for RIVER ROCK HOMES, PHASE 1?
BROWN & GAY ENGINEERS INC. is the design firm of record for RIVER ROCK HOMES, PHASE 1, according to its TDLR filing.
How much does RIVER ROCK HOMES, PHASE 1 cost and how big is it?
RIVER ROCK HOMES, PHASE 1 has an estimated construction value of $525K, based on its TDLR filing.
๐Scope of Work
The plans are for water, sanitary, storm sewer and paving to serve a section of the 27 single family homes. The
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Sep 23, 2014
Review Complete
Inspection Complete
Closed
Mar 1, 2015
๐Related Projects
๐๏ธSame Design Firm
$108.3M total๐Nearby Projects
Within 1 kmProperty Owner
Design Firm
Explore Area
Find Professionals
Need a contractor for this project?
Browse verified general contractors active in Harris County
Find General Contractors in Harris