US 77
US 77 is a new construction project at US 77, Waxahachie, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2021). The project has an estimated value of $20.0M.
๐Project Metrics
TDLR #EABPRJB8807478Project Closed
Project has been completed and closed
US 77 is a New Construction project located at US 77, Waxahachie, TX 75165 in Waxahachie, Texas. The project has an estimated value of $20.0M. TXDOT DISTRICT: DALLAS is the property owner and BROWN & GAY ENGINEERS INC. is the design firm of record. The project was registered with TDLR on December 27, 2017.
โFrequently Asked Questions
What is US 77?
US 77 is a new construction project at US 77 in Waxahachie, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Replace bridge and approaches. Reconstruct and convert 2-lane undivided to 4-lane divided one-way couplet
Is US 77 open in Waxahachie?
Construction on US 77 is complete โ TDLR records show the project passed its required accessibility inspection in Dec 2021. The building is finished and very likely open.
Where is US 77 located?
US 77 is located at US 77, Waxahachie, TX, 75165, in Dallas County.
Who is the owner or developer of US 77?
TXDOT DISTRICT: DALLAS is the property owner/developer of record for US 77, per its TDLR project registration.
Who is the architect or design firm for US 77?
BROWN & GAY ENGINEERS INC. is the design firm of record for US 77, according to its TDLR filing.
How much does US 77 cost and how big is it?
US 77 has an estimated construction value of $20.0M, based on its TDLR filing.
๐Scope of Work
Replace bridge and approaches. Reconstruct and convert 2-lane undivided to 4-lane divided one-way couplet
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Dec 27, 2017
Review Complete
Inspection Complete
Closed
Dec 1, 2021
๐Related Projects
๐คSame Owner
$37.03B total๐๏ธSame Design Firm
$108.3M totalProperty Owner
Design Firm
Registered Accessibility Specialist
Dallas County Economy
Explore Area
Find Professionals
Need a contractor for this project?
Browse verified general contractors active in Dallas County
Find General Contractors in Dallas