OPTION CARE
OPTION CARE is a renovation/alteration project at 14220 NORTH BROOK DRIVE Suite 100, San Antonio, in Bexar County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2016). The project has an estimated value of $1.2M.
๐Project Metrics
TDLR #EABPRJB6804674Project Closed
Project has been completed and closed
OPTION CARE is a Renovation/Alteration project located at 14220 NORTH BROOK DRIVE Suite 100, San Antonio, TX 78232 in San Antonio, Texas. The project has an estimated value of $1.2M. 4040 BROADWAY LTD. is the property owner and LK DESIGN GROUP INC. is the design firm of record. The project was registered with TDLR on November 12, 2015.
โFrequently Asked Questions
What is OPTION CARE?
OPTION CARE is a renovation/alteration project at 14220 NORTH BROOK DRIVE Suite 100 in San Antonio, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior remodel
Is OPTION CARE open in San Antonio?
Construction on OPTION CARE is complete โ TDLR records show the project passed its required accessibility inspection in Apr 2016. The building is finished and very likely open.
Where is OPTION CARE located?
OPTION CARE is located at 14220 NORTH BROOK DRIVE Suite 100, San Antonio, TX, 78232, in Bexar County.
Who is the owner or developer of OPTION CARE?
4040 BROADWAY LTD. is the property owner/developer of record for OPTION CARE, per its TDLR project registration.
Who is the architect or design firm for OPTION CARE?
LK DESIGN GROUP INC. is the design firm of record for OPTION CARE, according to its TDLR filing.
How much does OPTION CARE cost and how big is it?
OPTION CARE has an estimated construction value of $1.2M, based on its TDLR filing.
๐Scope of Work
Interior remodel
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Nov 12, 2015
Review Complete
Inspection Complete
Closed
Apr 27, 2016