BAPTIST MSO CLINIC
BAPTIST MSO CLINIC is a renovation/alteration project at 151 STAGECOACH TRAIL, San Marcos, in Hays County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $1.0M.
๐Project Metrics
TDLR #EABPRJB9803705Review Complete
Design review complete, construction may proceed
BAPTIST MSO CLINIC is a Renovation/Alteration project located at 151 STAGECOACH TRAIL, San Marcos, TX 78666 in San Marcos, Texas. The project has an estimated value of $1.0M. 2202 HUNTER ROAD INVESTORS L.P. is the property owner and LK DESIGN GROUP INC. is the design firm of record. The project was registered with TDLR on October 24, 2018.
โFrequently Asked Questions
What is BAPTIST MSO CLINIC?
BAPTIST MSO CLINIC is a renovation/alteration project at 151 STAGECOACH TRAIL in San Marcos, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior finishout
Is BAPTIST MSO CLINIC open in San Marcos?
BAPTIST MSO CLINIC is currently under construction in San Marcos, TX. Its current TDLR status is "Review Complete".
Where is BAPTIST MSO CLINIC located?
BAPTIST MSO CLINIC is located at 151 STAGECOACH TRAIL, San Marcos, TX, 78666, in Hays County.
Who is the owner or developer of BAPTIST MSO CLINIC?
2202 HUNTER ROAD INVESTORS L.P. is the property owner/developer of record for BAPTIST MSO CLINIC, per its TDLR project registration.
Who is the architect or design firm for BAPTIST MSO CLINIC?
LK DESIGN GROUP INC. is the design firm of record for BAPTIST MSO CLINIC, according to its TDLR filing.
How much does BAPTIST MSO CLINIC cost and how big is it?
BAPTIST MSO CLINIC has an estimated construction value of $1.0M, based on its TDLR filing.
๐Scope of Work
Interior finishout
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Oct 24, 2018
Review Complete
Oct 24, 2018
Inspection Complete
Closed
๐Related Projects
๐๏ธSame Design Firm
$389.6M total๐Related City Permits
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work DOWNSTAIRS SYSTEM ONLY
Addition/remodel. 2-story addition to rear of existing noncomplying 1-story single family residence. Addition will consist of a family room dining room laundry room mudroom primary bedroom and bathroom and screened porch on the 1st floor and two bedrooms one bathroom and a loft on the 2nd floor. Interior remodel. Demolish existing unpermitted screened porch. Retroactively permit addition to enlarge existing covered front porch. Addition/remodel will result in a 5 bedroom 3 bathroom residence.
Will be replacing sewer yard line and water yard line Approximate 45 ft each
Tunnel under slab up to 5 to expose and replace failed 2 cast iron lavatory drain.
90 trench for yard sewer replace