3RD FLOOR SPEC SUITE
3RD FLOOR SPEC SUITE is a renovation/alteration project at 13355 NOEL ROAD Suite 320, Dallas, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2016). The project has an estimated value of $74K.
๐Project Metrics
TDLR #EABPRJB6812946Project Closed
Project has been completed and closed
3RD FLOOR SPEC SUITE is a Renovation/Alteration project located at 13355 NOEL ROAD Suite 320, Dallas, TX 75240 in Dallas, Texas. The project has an estimated value of $74K. SPUS7 GALLERIA LP is the property owner and ENTOS DESIGN is the design firm of record. The project was registered with TDLR on March 25, 2016.
โFrequently Asked Questions
What is 3RD FLOOR SPEC SUITE?
3RD FLOOR SPEC SUITE is a renovation/alteration project at 13355 NOEL ROAD Suite 320 in Dallas, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation of existing space.
Is 3RD FLOOR SPEC SUITE open in Dallas?
Construction on 3RD FLOOR SPEC SUITE is complete โ TDLR records show the project passed its required accessibility inspection in Jun 2016. The building is finished and very likely open.
Where is 3RD FLOOR SPEC SUITE located?
3RD FLOOR SPEC SUITE is located at 13355 NOEL ROAD Suite 320, Dallas, TX, 75240, in Dallas County.
Who is the owner or developer of 3RD FLOOR SPEC SUITE?
SPUS7 GALLERIA LP is the property owner/developer of record for 3RD FLOOR SPEC SUITE, per its TDLR project registration.
Who is the architect or design firm for 3RD FLOOR SPEC SUITE?
ENTOS DESIGN is the design firm of record for 3RD FLOOR SPEC SUITE, according to its TDLR filing.
How much does 3RD FLOOR SPEC SUITE cost and how big is it?
3RD FLOOR SPEC SUITE has an estimated construction value of $74K, based on its TDLR filing.
๐Scope of Work
Renovation of existing space.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Mar 25, 2016
Review Complete
Inspection Complete
Closed
Jun 1, 2016