FITNESS 1440
FITNESS 1440 is a renovation/alteration project at 103 NW LOOP 281, STE. 800, Longview, in Gregg County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2016). The project has an estimated value of $275K.
๐Project Metrics
TDLR #EABPRJB6813338Project Closed
Project has been completed and closed
FITNESS 1440 is a Renovation/Alteration project located at 103 NW LOOP 281, STE. 800, Longview, TX 75601 in Longview, Texas. The project has an estimated value of $275K. RON FRANCO is the property owner and WIM ENGINEERING is the design firm of record. The project was registered with TDLR on March 31, 2016.
โFrequently Asked Questions
What is FITNESS 1440?
FITNESS 1440 is a renovation/alteration project at 103 NW LOOP 281, STE. 800 in Longview, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Framng,Flooring, drywall, pain, MEP
Is FITNESS 1440 open in Longview?
Construction on FITNESS 1440 is complete โ TDLR records show the project passed its required accessibility inspection in May 2016. The building is finished and very likely open.
Where is FITNESS 1440 located?
FITNESS 1440 is located at 103 NW LOOP 281, STE. 800, Longview, TX, 75601, in Gregg County.
Who is the owner or developer of FITNESS 1440?
RON FRANCO is the property owner/developer of record for FITNESS 1440, per its TDLR project registration.
Who is the architect or design firm for FITNESS 1440?
WIM ENGINEERING is the design firm of record for FITNESS 1440, according to its TDLR filing.
How much does FITNESS 1440 cost and how big is it?
FITNESS 1440 has an estimated construction value of $275K, based on its TDLR filing.
๐Scope of Work
Framng,Flooring, drywall, pain, MEP
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Mar 31, 2016
Review Complete
Inspection Complete
Closed
May 1, 2016