Gregg County, TX Construction Projects

14 Cities · 1,469 Projects

1,469
Projects
$3.55B
Total Value
536
New Builds
933
Renovations
14
Cities
17.9M
Sq Ft

What is being built in Gregg County, Texas?

Gregg County, Texas has 1,469 construction and development projects on file worth $3.55B — 536 new construction and 933 renovations or remodels, spread across 14 cities and towns. Each record is a real filing from Texas public construction records and names the project, its declared value and the date it was registered.

Which cities in Gregg County have the most construction?

The most active cities for construction in Gregg County are Longview (162 projects), Kilgore (27 projects), Gladewater (5 projects), Tyler (1 project), Lakeport (1 project). Counts reflect the filings on this page, so a city with a single large development can carry more value than one with more projects.

What new developments are coming to Gregg County?

The most recently filed new-construction projects in Gregg County are St Matthews Ministry Center ($700K), Chicken Salad Chick ($1.3M), FAITH BAPTIST CHURCH - New Building ($1.2M), Gregg County Agricultural Extension Office ($1.7M). A new-construction filing is the earliest public signal that something new is being built, usually well before it opens.

Gregg County Map

Project locations across the county

Gregg County Economy

Federal Reserve Economic Data (FRED)

5.1%↓
Unemployment Rate
58K
Labor Force
Available workers
+4.1%
Unemployment YoY
Rising
Gregg County economy: 5.1% unemployment with 58K labor force supporting 1,469 construction projects worth $3.55B.
44 New Projects in Last 6 Months
$114.4M in new investment
1059
Closed
220
Review Complete
106
Registered
Zabalist / visual intelligence

See the shape of development

Compare project scale, registration dates, and locations across 200 loaded TDLR filings from 1,469 registered projects. This is the loaded selection, not a measure of every project in the market.

Gregg County
Estimated construction value$627.6MSum of 200 shown records with value
Records in view200 / 200Ready to inspect and compare
Largest record’s share12.1%Share of reported value shown
01

Where the value sits

Area = reported value
Select a block to inspect0 without reported value · Smaller records grouped
Gregg County

Comparisons use only these 200 records. Missing values are excluded from totals. Recorded value is not revenue or a quality rating.

All Projects

1,469 TDLR · 0 Site Plans

Showing 20 of 200 listed TDLR filings

Review Complete
$746K

Target 2283 Remodel

3092 N Eastman Rd., Longview, TX 75604

67,176 sqftSep 10, 2026
Registered
$504K

AutoZone #TX11258

1412 Broadway Ave, Gladewater, TX 75647

7,502 sqftAug 13, 2026
Registered
$250K

Taco Casa

116 East Loop 281, Longview, TX 75605

2,225 sqftAug 6, 2026
Review Complete
$700K

AAON - Phase 3

203 Gum Springs Rd, Longview, TX 75602

470,770 sqftJul 30, 2026
Review Complete
$370K

SKECHERS

1733 NW Loop 281 STE 4, Longview, TX 75604

12,475 sqftJul 28, 2026

Gregg County construction: common questions

How many construction projects are in Gregg County, Texas?
Gregg County has 1,469 registered construction projects worth $3.55B, covering 17,924,136 square feet of development. The average project is valued at $2.4M.
What kind of construction is happening in Gregg County?
Gregg County has 536 new construction projects (36%) and 933 renovation or remodel projects (64%) on file. Work spans commercial, residential, public and mixed-use development.
Who is building in Gregg County?
The property owners with the highest declared value on file in Gregg County are Longview ISD, Sabine Bridge Crossing LLC, LeTourneau University. The architecture and design firms appearing most often on Gregg County filings are DLR Group, Force Design, Inc., Design Collaborative, Inc..
Where does this Gregg County construction data come from?
Every project on this page is a TDLR-registered construction filing from Texas public records, not an estimate or a listing. Each entry keeps the project name, declared value, owner and registration date exactly as filed, which is why a project can appear here months before any visible work starts on site.