SPEC 1020
SPEC 1020 is a renovation/alteration project at 909 LAKE CAROLYN PARKWAY Suite 1020, Irving, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jul 2016). The project has an estimated value of $107K.
๐Project Metrics
TDLR #EABPRJB6816390Project Closed
Project has been completed and closed
SPEC 1020 is a Renovation/Alteration project located at 909 LAKE CAROLYN PARKWAY Suite 1020, Irving, TX 75039 in Irving, Texas. The project has an estimated value of $107K. KBS is the property owner and ENTOS DESIGN is the design firm of record. The project was registered with TDLR on May 12, 2016.
โFrequently Asked Questions
What is SPEC 1020?
SPEC 1020 is a renovation/alteration project at 909 LAKE CAROLYN PARKWAY Suite 1020 in Irving, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation of existing suite with new walls, doors, millwork, finishes, and lighting.
Is SPEC 1020 open in Irving?
Construction on SPEC 1020 is complete โ TDLR records show the project passed its required accessibility inspection in Jul 2016. The building is finished and very likely open.
Where is SPEC 1020 located?
SPEC 1020 is located at 909 LAKE CAROLYN PARKWAY Suite 1020, Irving, TX, 75039, in Dallas County.
Who is the owner or developer of SPEC 1020?
KBS is the property owner/developer of record for SPEC 1020, per its TDLR project registration.
Who is the architect or design firm for SPEC 1020?
ENTOS DESIGN is the design firm of record for SPEC 1020, according to its TDLR filing.
How much does SPEC 1020 cost and how big is it?
SPEC 1020 has an estimated construction value of $107K, based on its TDLR filing.
๐Scope of Work
Renovation of existing suite with new walls, doors, millwork, finishes, and lighting.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
May 12, 2016
Review Complete
Inspection Complete
Closed
Jul 1, 2016