PLANET FITNESS
PLANET FITNESS is a renovation/alteration project at 6425 S. IH-35 FRONTAGE RD., Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2016). The project has an estimated value of $500K.
๐Project Metrics
TDLR #EABPRJB6819254Project Closed
Project has been completed and closed
PLANET FITNESS is a Renovation/Alteration project located at 6425 S. IH-35 FRONTAGE RD., Austin, TX 78744 in Austin, Texas. The project has an estimated value of $500K. GREG ATWOOD/MIKE TURNER is the property owner and DK MULLIN ARCHITECTS is the design firm of record. The project was registered with TDLR on June 23, 2016.
โFrequently Asked Questions
What is PLANET FITNESS?
PLANET FITNESS is a renovation/alteration project at 6425 S. IH-35 FRONTAGE RD. in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior fit out for a commercial building
Is PLANET FITNESS open in Austin?
Construction on PLANET FITNESS is complete โ TDLR records show the project passed its required accessibility inspection in Dec 2016. The building is finished and very likely open.
Where is PLANET FITNESS located?
PLANET FITNESS is located at 6425 S. IH-35 FRONTAGE RD., Austin, TX, 78744, in Travis County.
Who is the owner or developer of PLANET FITNESS?
GREG ATWOOD/MIKE TURNER is the property owner/developer of record for PLANET FITNESS, per its TDLR project registration.
Who is the architect or design firm for PLANET FITNESS?
DK MULLIN ARCHITECTS is the design firm of record for PLANET FITNESS, according to its TDLR filing.
How much does PLANET FITNESS cost and how big is it?
PLANET FITNESS has an estimated construction value of $500K, based on its TDLR filing.
๐Scope of Work
Interior fit out for a commercial building
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jun 23, 2016
Review Complete
Inspection Complete
Closed
Dec 1, 2016
๐Related Projects
๐คSame Owner
$1.5M total๐Related City Permits
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work
Replacement of an existing water heater Tankless Water Heater
Install new 6.6kW rooftop solar system to existing residential only.
Emergency call. 1 for 1 replacement of failed A phase line base in main disconnect for Suite 165. Replacement to be made utilizing all existing wiring and existing equipment. Inspection department has been notified of this emergency call issue. Requires emergency disconnect and reconnect from Austin Energy.
Remove existing roof system down to roof decking install above deck insulation to meet Building code (R25) Install PVC Roof System