IH 40 AND BELL ST
IH 40 AND BELL ST is a new construction project at IH 40 AND BELL ST, Amarillo, in Potter County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2018). The project has an estimated value of $5.3M.
๐Project Metrics
TDLR #EABPRJB7810546Project Closed
Project has been completed and closed
IH 40 AND BELL ST is a New Construction project located at IH 40 AND BELL ST, Amarillo, TX 79114 in Amarillo, Texas. The project has an estimated value of $5.3M. TXDOT DISTRICT: AMARILLO is the property owner and BGE INC. is the design firm of record. The project was registered with TDLR on February 15, 2017.
โFrequently Asked Questions
What is IH 40 AND BELL ST?
IH 40 AND BELL ST is a new construction project at IH 40 AND BELL ST in Amarillo, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Bridge Replacement and Traffic Signal Upgrade with Sidewalk and ADA Ramps
Is IH 40 AND BELL ST open in Amarillo?
Construction on IH 40 AND BELL ST is complete โ TDLR records show the project passed its required accessibility inspection in Apr 2018. The building is finished and very likely open.
Where is IH 40 AND BELL ST located?
IH 40 AND BELL ST is located at IH 40 AND BELL ST, Amarillo, TX, 79114, in Potter County.
Who is the owner or developer of IH 40 AND BELL ST?
TXDOT DISTRICT: AMARILLO is the property owner/developer of record for IH 40 AND BELL ST, per its TDLR project registration.
Who is the architect or design firm for IH 40 AND BELL ST?
BGE INC. is the design firm of record for IH 40 AND BELL ST, according to its TDLR filing.
How much does IH 40 AND BELL ST cost and how big is it?
IH 40 AND BELL ST has an estimated construction value of $5.3M, based on its TDLR filing.
๐Scope of Work
Bridge Replacement and Traffic Signal Upgrade with Sidewalk and ADA Ramps
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Feb 15, 2017
Review Complete
Inspection Complete
Closed
Apr 1, 2018
๐Related Projects
๐คSame Owner
$37.03B totalProperty Owner
Design Firm
Potter County Economy
Explore Area
Find Professionals
Need a contractor for this project?
Browse verified general contractors active in Potter County
Find General Contractors in Potter