Project intelligenceTDLR EABPRJB8815137New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

SL 335 SEGMENT B2 PHASE1

AT HOLLYWOOD & HELIUM RD, Amarillo, TX, 79119

Construction complete · Aug 2021Inspection Complete

SL 335 SEGMENT B2 PHASE1 is a new construction project at AT HOLLYWOOD & HELIUM RD, Amarillo, in Randall County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2021). The project has an estimated value of $46.7M.

Estimated project value
$46.7M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
—
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2y 8mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Apr 18, 20181,201 days across supplied datesAug 1, 2021

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    227 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    974 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Inspection Complete

Final inspection completed, awaiting project closure

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 79119 (Amarillo)

One email per change. Unsubscribe in one click. Privacy.

SL 335 SEGMENT B2 PHASE1 is a New Construction project located at AT HOLLYWOOD & HELIUM RD, Amarillo, TX 79119 in Amarillo, Texas. The project has an estimated value of $46.7M. TXDOT DISTRICT: AMARILLO is the property owner and HDR ENGINEERING is the design firm of record. The project was registered with TDLR on April 18, 2018.

Frequently Asked Questions

What is SL 335 SEGMENT B2 PHASE1?

SL 335 SEGMENT B2 PHASE1 is a new construction project at AT HOLLYWOOD & HELIUM RD in Amarillo, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: B-2 Phase I: Construct Frontage Roads for Future Freeway

Is SL 335 SEGMENT B2 PHASE1 open in Amarillo?

Construction on SL 335 SEGMENT B2 PHASE1 is complete — TDLR records show the project passed its required accessibility inspection in Aug 2021. The building is finished and very likely open.

Where is SL 335 SEGMENT B2 PHASE1 located?

SL 335 SEGMENT B2 PHASE1 is located at AT HOLLYWOOD & HELIUM RD, Amarillo, TX, 79119, in Randall County.

Who is the owner or developer of SL 335 SEGMENT B2 PHASE1?

TXDOT DISTRICT: AMARILLO is the property owner/developer of record for SL 335 SEGMENT B2 PHASE1, per its TDLR project registration.

Who is the architect or design firm for SL 335 SEGMENT B2 PHASE1?

HDR ENGINEERING is the design firm of record for SL 335 SEGMENT B2 PHASE1, according to its TDLR filing.

How much does SL 335 SEGMENT B2 PHASE1 cost and how big is it?

SL 335 SEGMENT B2 PHASE1 has an estimated construction value of $46.7M, based on its TDLR filing.

Scope of Work

B-2 Phase I: Construct Frontage Roads for Future Freeway

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

AT HOLLYWOOD & HELIUM RD, Amarillo, TX, 79119

34.94447, -101.88503

Watch all construction in 79119 (Amarillo)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Amarillo?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.