CHERRY PEAK OFFICE CONDOS BUILDING 11 is a new construction project at 3503 WILD CHERRY DR, Lakeway, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Feb 2018). The project has an estimated value of $300K.
Project has been completed and closed
CHERRY PEAK OFFICE CONDOS BUILDING 11 is a New Construction project located at 3503 WILD CHERRY DR, Lakeway, TX 78738 in Lakeway, Texas. The project has an estimated value of $300K. CHERRY PEAK LTD is the property owner and CLARK RICHARDSON LLC is the design firm of record. The project was registered with TDLR on June 29, 2017.
CHERRY PEAK OFFICE CONDOS BUILDING 11 is a new construction project at 3503 WILD CHERRY DR in Lakeway, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New Construction- Office Building
Construction on CHERRY PEAK OFFICE CONDOS BUILDING 11 is complete โ TDLR records show the project passed its required accessibility inspection in Feb 2018. The building is finished and very likely open.
CHERRY PEAK OFFICE CONDOS BUILDING 11 is located at 3503 WILD CHERRY DR, Lakeway, TX, 78738, in Travis County.
CHERRY PEAK LTD is the property owner/developer of record for CHERRY PEAK OFFICE CONDOS BUILDING 11, per its TDLR project registration.
CLARK RICHARDSON LLC is the design firm of record for CHERRY PEAK OFFICE CONDOS BUILDING 11, according to its TDLR filing.
CHERRY PEAK OFFICE CONDOS BUILDING 11 has an estimated construction value of $300K, based on its TDLR filing.
New Construction- Office Building
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Jun 29, 2017
Review Complete
Inspection Complete
Closed
Feb 1, 2018
Building permits found at or near this location
Upgrade existing main service in order to meet local and national electrical codes including new riser meter exterior main and panel
Replace cast iron drain lines under the foundation for 2 full bathrooms and a half bathroom kitchen and washer drain line as well. Total of 3 access holes will be made one will be made outside the hall bathroom and the second will be made outside the primary bathroom and the third will be made in the back where drain line exits the foundation total length of tunnel is approximately 90 feet. Will replace sewer line from the home to septic tank which is a 1 foot run. ***Customer utilizes AWU for water
replace existing grease trap with a new 250 gallons grease trap approval number 25-55397
Full service upgrade including meter
Replacement of complete existing central heat and air system with or without duct work
Need a contractor for this project?
Browse verified general contractors active in Travis County
Find General Contractors in Travis