Design review complete, construction may proceed
CHERRY PEAK OFFICE CONDOS is a New Construction project located at 3503 WILD CHERRY DR., Lakeway, TX 78738 in Lakeway, Texas. The project has an estimated value of $3.0M. CHERRY PEAK LTD is the property owner and NOBLE SURVEYING & ENGINEERING WORKS LLC is the design firm of record. The project was registered with TDLR on July 11, 2017.
CHERRY PEAK OFFICE CONDOS is a new construction project at 3503 WILD CHERRY DR., Lakeway, TX 78738 in Lakeway, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Site Construction
CHERRY PEAK OFFICE CONDOS is currently under construction in Lakeway, TX. Its current TDLR status is "Review Complete".
CHERRY PEAK OFFICE CONDOS is located at 3503 WILD CHERRY DR., Lakeway, TX 78738, Lakeway, TX, 78738, in Travis County.
CHERRY PEAK LTD is the property owner/developer of record for CHERRY PEAK OFFICE CONDOS, per its TDLR project registration.
NOBLE SURVEYING & ENGINEERING WORKS LLC is the design firm of record for CHERRY PEAK OFFICE CONDOS, according to its TDLR filing.
CHERRY PEAK OFFICE CONDOS has an estimated construction value of $3.0M, based on its TDLR filing.
Site Construction
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Jul 11, 2017
Review Complete
Jul 11, 2017
Inspection Complete
Closed
Building permits found at or near this location
Upgrade existing main service in order to meet local and national electrical codes including new riser meter exterior main and panel
Replace cast iron drain lines under the foundation for 2 full bathrooms and a half bathroom kitchen and washer drain line as well. Total of 3 access holes will be made one will be made outside the hall bathroom and the second will be made outside the primary bathroom and the third will be made in the back where drain line exits the foundation total length of tunnel is approximately 90 feet. Will replace sewer line from the home to septic tank which is a 1 foot run. ***Customer utilizes AWU for water
replace existing grease trap with a new 250 gallons grease trap approval number 25-55397
Full service upgrade including meter
Replacement of complete existing central heat and air system with or without duct work
Need a contractor for this project?
Browse verified general contractors active in Travis County
Find General Contractors in Travis