LEE ELEMENTARY SCHOOL RENOVATIONS
๐Project Metrics
TDLR #EABPRJB8801115Review Complete
Design review complete, construction may proceed
๐Scope of Work
The Work includes, but is not limited to, selective demolition, rough carpentry, water repellants, building insu
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$800K total๐Related City Permits
Building permits found at or near this location
New construction of pool (630 sqft) concrete deck and pavers (702 sqft) and 112 sqft of synth turf with compact road base
New pool and spa
Disconnect/reconnect to Upgrade main distribution panel.
Install new 8.265 kw rooftop solar system for existing residential only.
Replacement of existing boiler with new pre-ordered and pre-purchased similar capacity high efficiency boiler.