TFC TSBVI
TFC TSBVI is a new construction project at 1100 W 45TH STREET, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2019). The project has an estimated value of $1.8M.
๐Project Metrics
TDLR #EABPRJB9805605Project Closed
Project has been completed and closed
TFC TSBVI is a New Construction project located at 1100 W 45TH STREET, Austin, TX 78756 in Austin, Texas. The project has an estimated value of $1.8M. TEXAS FACILITIES COMMISSION is the property owner and GSC ARCHITECTS is the design firm of record. The project was registered with TDLR on November 20, 2018.
โFrequently Asked Questions
What is TFC TSBVI?
TFC TSBVI is a new construction project at 1100 W 45TH STREET in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: The project includes a new PEMB, approximately 5,000 SF,comprised of institutional commercial construction suit
Is TFC TSBVI open in Austin?
Construction on TFC TSBVI is complete โ TDLR records show the project passed its required accessibility inspection in Aug 2019. The building is finished and very likely open.
Where is TFC TSBVI located?
TFC TSBVI is located at 1100 W 45TH STREET, Austin, TX, 78756, in Travis County.
Who is the owner or developer of TFC TSBVI?
TEXAS FACILITIES COMMISSION is the property owner/developer of record for TFC TSBVI, per its TDLR project registration.
Who is the architect or design firm for TFC TSBVI?
GSC ARCHITECTS is the design firm of record for TFC TSBVI, according to its TDLR filing.
How much does TFC TSBVI cost and how big is it?
TFC TSBVI has an estimated construction value of $1.8M, based on its TDLR filing.
๐Scope of Work
The project includes a new PEMB, approximately 5,000 SF,comprised of institutional commercial construction suit
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Nov 20, 2018
Review Complete
Inspection Complete
Closed
Aug 1, 2019
๐Related Projects
๐คSame Owner
$1.54B total๐๏ธSame Design Firm
$5.5M total๐Related City Permits
Building permits found at or near this location
Remodel for new design center in existing office unit. Scope of work is 3645 SF of Unit 300. Unit 300 in total is 25487 SF
Prewire & Install Level 2 EV Charger
Install Level 2 EV Charger
New construction of 2 story sfr with 3 beds 2.5 baths and attached garage
Construct 2 new driveway approaches of 70 FT(35 ft each) and sidewalk of 450 LF SP-2025-0180C. 2026 094551 000 00 SSI
Property Owner
Design Firm
Registered Accessibility Specialist
Travis County Economy
Explore Area
Find Professionals
Need a contractor for this project?
Browse verified general contractors active in Travis County
Find General Contractors in Travis