CRAFTWORK
CRAFTWORK is a renovation/alteration project at 10727 DOMAIN DRIVE, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2019). The project has an estimated value of $350K.
๐Project Metrics
TDLR #EABPRJB8814102Inspection Complete
Final inspection completed, awaiting project closure
CRAFTWORK is a Renovation/Alteration project located at 10727 DOMAIN DRIVE, Austin, TX 78758 in Austin, Texas. The project has an estimated value of $350K. AUSTIN FLATIRON LP is the property owner and 97W is the design firm of record. The project was registered with TDLR on April 5, 2018.
โFrequently Asked Questions
What is CRAFTWORK?
CRAFTWORK is a renovation/alteration project at 10727 DOMAIN DRIVE in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Coffee Shop / Co-working Interior Tenant Fit-out in Existing Shell Space
Is CRAFTWORK open in Austin?
Construction on CRAFTWORK is complete โ TDLR records show the project passed its required accessibility inspection in Jun 2019. The building is finished and very likely open.
Where is CRAFTWORK located?
CRAFTWORK is located at 10727 DOMAIN DRIVE, Austin, TX, 78758, in Travis County.
Who is the owner or developer of CRAFTWORK?
AUSTIN FLATIRON LP is the property owner/developer of record for CRAFTWORK, per its TDLR project registration.
Who is the architect or design firm for CRAFTWORK?
97W is the design firm of record for CRAFTWORK, according to its TDLR filing.
How much does CRAFTWORK cost and how big is it?
CRAFTWORK has an estimated construction value of $350K, based on its TDLR filing.
๐Scope of Work
Coffee Shop / Co-working Interior Tenant Fit-out in Existing Shell Space
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Apr 5, 2018
Review Complete
Inspection Complete
Jun 1, 2019
Closed
๐Related Projects
๐คSame Owner
$45.9M total๐Related City Permits
Building permits found at or near this location
install power for tree lights
Express: Replacement of windows
Express: Window replacement size for size
New irrigation installation
INTERIOR REMODEL TO EXISTING OFFICE SPACE