SPEC SUITE 575
SPEC SUITE 575 is a renovation/alteration project at 6363 N. STATE HIGHWAY 161, Irving, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2018). The project has an estimated value of $74K.
๐Project Metrics
TDLR #EABPRJB8814870Project Closed
Project has been completed and closed
SPEC SUITE 575 is a Renovation/Alteration project located at 6363 N. STATE HIGHWAY 161, Irving, TX 75038 in Irving, Texas. The project has an estimated value of $74K. PIEDMONT OFFICE REALTY TRUST is the property owner and ENTOS DESIGN is the design firm of record. The project was registered with TDLR on April 16, 2018.
โFrequently Asked Questions
What is SPEC SUITE 575?
SPEC SUITE 575 is a renovation/alteration project at 6363 N. STATE HIGHWAY 161 in Irving, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior renovation
Is SPEC SUITE 575 open in Irving?
Construction on SPEC SUITE 575 is complete โ TDLR records show the project passed its required accessibility inspection in Jun 2018. The building is finished and very likely open.
Where is SPEC SUITE 575 located?
SPEC SUITE 575 is located at 6363 N. STATE HIGHWAY 161, Irving, TX, 75038, in Dallas County.
Who is the owner or developer of SPEC SUITE 575?
PIEDMONT OFFICE REALTY TRUST is the property owner/developer of record for SPEC SUITE 575, per its TDLR project registration.
Who is the architect or design firm for SPEC SUITE 575?
ENTOS DESIGN is the design firm of record for SPEC SUITE 575, according to its TDLR filing.
How much does SPEC SUITE 575 cost and how big is it?
SPEC SUITE 575 has an estimated construction value of $74K, based on its TDLR filing.
๐Scope of Work
Interior renovation
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Apr 16, 2018
Review Complete
Inspection Complete
Closed
Jun 1, 2018