SILICON LABS HQ is a renovation/alteration project at 400 W. CESAR CHAVEZ, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $250K across about 1 sq ft.
Design review complete, construction may proceed
SILICON LABS HQ is a Renovation/Alteration project located at 400 W. CESAR CHAVEZ, Austin, TX 78701 in Austin, Texas. The project has an estimated value of $250K covering 1 sq ft. SILICON LABS is the property owner and GENSLER is the design firm of record. The project was registered with TDLR on April 17, 2018.
SILICON LABS HQ is a renovation/alteration project at 400 W. CESAR CHAVEZ in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: SLAB OPENING ON LEVEL 3 AND 4 FOR NEW INTERCONNECTINGSTAIRS. VAR175
SILICON LABS HQ is currently under construction in Austin, TX. Its current TDLR status is "Review Complete".
SILICON LABS HQ is located at 400 W. CESAR CHAVEZ, Austin, TX, 78701, in Travis County.
SILICON LABS is the property owner/developer of record for SILICON LABS HQ, per its TDLR project registration.
GENSLER is the design firm of record for SILICON LABS HQ, according to its TDLR filing.
SILICON LABS HQ has an estimated construction value of $250K and approximately 1 square feet (about $250.00K/sqft), based on its TDLR filing.
SLAB OPENING ON LEVEL 3 AND 4 FOR NEW INTERCONNECTINGSTAIRS. VAR175
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Apr 17, 2018
Review Complete
Apr 17, 2018
Inspection Complete
Closed
Building permits found at or near this location
This project includes renovations to the hotel level 1 lobby/restaurant and hotel level 7 pool deck areas. Work will be split into phases to keep life safety systems for both areas of the renovation intact. Phase 1 - involves demolition of existing Perfect Strangers (restaurant) vestibule and bar services areas.
This project includes renovations to the hotel level 1 lobby/restaurant and hotel level 7 pool deck areas. Work will be split into phases to keep life safety systems for both areas of the renovation intact. Phase 2 - involves demolition and renovation of new reception trade room parlor retail and hydration station areas. Finish upgrades to porte cochrere entry elevator lobby and corridor.
Porch Enclosure- enclose existing porch on two sides with windows and door. Match existing siding on exterior. Install new flooring over wood deck. Insulate and sheetrock.
This project includes renovations to the hotel level 1 lobby/restaurant and hotel level 7 pool deck areas. Work will be split into phases to keep life safety systems for both areas of the renovation intact. Phase 3 - Demolition and renovation of new parlor area.
Two-Unit use; Addition/ remodel of existing 1-story single-family residential to include: demo of 1 bedroom 1 bath and living area; addition of 1 bedroom 1 bath living room and covered patio on 1st floor; 2nd floor addition to include primary bedroom bath and entertainment room. Interior remodel.