Project has been completed and closed
LEVEL 2 WEST WORKPLACE is a Renovation/Alteration project located at 400 W. CESAR CHAVEZ ST. Level 2 West, Austin, TX 78701 in Austin, Texas. The project has an estimated value of $500K. SILICON LABS is the property owner and GENSLER is the design firm of record. The project was registered with TDLR on October 18, 2018.
LEVEL 2 WEST WORKPLACE is a renovation/alteration project at 400 W. CESAR CHAVEZ ST. Level 2 West, Austin, TX 78701 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: This project is the renovation of the fitness center toupgrades to ceilings, finishes, mechanical & electrical
Construction on LEVEL 2 WEST WORKPLACE is complete โ TDLR records show the project passed its required accessibility inspection in May 2019. The building is finished and very likely open.
LEVEL 2 WEST WORKPLACE is located at 400 W. CESAR CHAVEZ ST. Level 2 West, Austin, TX 78701, Austin, TX, 78701, in Travis County.
SILICON LABS is the property owner/developer of record for LEVEL 2 WEST WORKPLACE, per its TDLR project registration.
GENSLER is the design firm of record for LEVEL 2 WEST WORKPLACE, according to its TDLR filing.
LEVEL 2 WEST WORKPLACE has an estimated construction value of $500K, based on its TDLR filing.
This project is the renovation of the fitness center toupgrades to ceilings, finishes, mechanical & electrical
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Oct 18, 2018
Review Complete
Inspection Complete
Closed
May 20, 2019
Building permits found at or near this location
This project includes renovations to the hotel level 1 lobby/restaurant and hotel level 7 pool deck areas. Work will be split into phases to keep life safety systems for both areas of the renovation intact. Phase 3 - Demolition and renovation of new parlor area.
This project includes renovations to the hotel level 1 lobby/restaurant and hotel level 7 pool deck areas. Work will be split into phases to keep life safety systems for both areas of the renovation intact. Phase 2 - involves demolition and renovation of new reception trade room parlor retail and hydration station areas. Finish upgrades to porte cochrere entry elevator lobby and corridor.
This project includes renovations to the hotel level 1 lobby/restaurant and hotel level 7 pool deck areas. Work will be split into phases to keep life safety systems for both areas of the renovation intact. Phase 1 - involves demolition of existing Perfect Strangers (restaurant) vestibule and bar services areas.
Porch Enclosure- enclose existing porch on two sides with windows and door. Match existing siding on exterior. Install new flooring over wood deck. Insulate and sheetrock.
Replacement of an existing water heater Replace 50 Gallon Electric Water Heater [Outdoor Closet