DSHS BLDG. ""T"" RECONFIGURATION OF SPAC
๐Project Metrics
TDLR #EABPRJB8818751Inspection Complete
Final inspection completed, awaiting project closure
๐Scope of Work
The demolition & construction of an open office that totals approximately 900 s.f.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$7.7M total๐๏ธSame Design Firm
$258K total๐Related City Permits
Building permits found at or near this location
Re-route three romex wires and an outlet in a 53 long section of nonstructural interior wall that is being moved 5 inches. A 42(H) x 54(W) section of sheetrock will be removed exposing the entire lengths of the wires that need rerouting. The existing wall is a 42 high nonstructural half-height wall made of two 2x4 frames parallel to one another and separated by approximately one inch of space (13.5 thick overall including sheetrock). The intent of the project is to remove the outer 2x4 frame reducing the thickness of the wall to only one 2x4 structure. The wires are routed through the outer frame so they need to be re-routed through the inner frame.
Mendocino Farms Install Internal illuminated channel letter
Mendocino Farms 1.2 South Elevation internal illuminated channel letters
Express: Replacing 7 windows (like for like)
Replace 2 Regulators and perform a Gas Pressure Test.