US 87
US 87 is a new construction project at UP RAILROAD AND BEALS CREEK, Big Spring, in Howard County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jan 2019). The project has an estimated value of $80K.
๐Project Metrics
TDLR #EABPRJB8820834Project Closed
Project has been completed and closed
US 87 is a New Construction project located at UP RAILROAD AND BEALS CREEK, Big Spring, TX 79720 in Big Spring, Texas. The project has an estimated value of $80K. TXDOT DISTRICT: ABILENE is the property owner and HDR ENGINEERING INC. is the design firm of record. The project was registered with TDLR on July 5, 2018.
โFrequently Asked Questions
What is US 87?
US 87 is a new construction project at UP RAILROAD AND BEALS CREEK in Big Spring, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Replace Bridge Deck including sidewalks, reconstruct sidewalk & pedestrian ramps on bridge approaches
Is US 87 open in Big Spring?
Construction on US 87 is complete โ TDLR records show the project passed its required accessibility inspection in Jan 2019. The building is finished and very likely open.
Where is US 87 located?
US 87 is located at UP RAILROAD AND BEALS CREEK, Big Spring, TX, 79720, in Howard County.
Who is the owner or developer of US 87?
TXDOT DISTRICT: ABILENE is the property owner/developer of record for US 87, per its TDLR project registration.
Who is the architect or design firm for US 87?
HDR ENGINEERING INC. is the design firm of record for US 87, according to its TDLR filing.
How much does US 87 cost and how big is it?
US 87 has an estimated construction value of $80K, based on its TDLR filing.
๐Scope of Work
Replace Bridge Deck including sidewalks, reconstruct sidewalk & pedestrian ramps on bridge approaches
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jul 5, 2018
Review Complete
Inspection Complete
Closed
Jan 1, 2019
๐Related Projects
๐คSame Owner
$110.3M total๐๏ธSame Design Firm
$2.10B total๐Nearby Projects
Within 1 kmProperty Owner
Design Firm
Registered Accessibility Specialist
Explore Area
Find Professionals
Need a contractor for this project?
Browse verified general contractors active in Howard County
Find General Contractors in Howard