Project intelligenceTDLR EABPRJB8810497New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

CSJ: 00006-03-134

BUS 70-G TO ARIZONA ST, Sweetwater, TX, 79556

Construction complete · Oct 2018Project Closed

CSJ: 00006-03-134 is a new construction project at BUS 70-G TO ARIZONA ST, Sweetwater, in Nolan County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2018). The project has an estimated value of $112K.

Estimated project value
$112K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
Not supplied
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
5 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Feb 14, 2018229 days across supplied datesOct 1, 2018

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    76 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    153 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 79556 (Sweetwater)

One email per change. Unsubscribe in one click. Privacy.

CSJ: 00006-03-134 is a New Construction project located at BUS 70-G TO ARIZONA ST, Sweetwater, TX 79556 in Sweetwater, Texas. The project has an estimated value of $112K. TXDOT DISTRICT: ABILENE is the property owner and ENTECH CIVIL ENGINEERS INC. is the design firm of record. The project was registered with TDLR on February 14, 2018.

Frequently Asked Questions

What is CSJ: 00006-03-134?

CSJ: 00006-03-134 is a new construction project at BUS 70-G TO ARIZONA ST in Sweetwater, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Rehabilitate Roadway, !-CST, Overlay and Limited Curb and Gutter

Is CSJ: 00006-03-134 open in Sweetwater?

Construction on CSJ: 00006-03-134 is complete — TDLR records show the project passed its required accessibility inspection in Oct 2018. The building is finished and very likely open.

Where is CSJ: 00006-03-134 located?

CSJ: 00006-03-134 is located at BUS 70-G TO ARIZONA ST, Sweetwater, TX, 79556, in Nolan County.

Who is the owner or developer of CSJ: 00006-03-134?

TXDOT DISTRICT: ABILENE is the property owner/developer of record for CSJ: 00006-03-134, per its TDLR project registration.

Who is the architect or design firm for CSJ: 00006-03-134?

ENTECH CIVIL ENGINEERS INC. is the design firm of record for CSJ: 00006-03-134, according to its TDLR filing.

How much does CSJ: 00006-03-134 cost and how big is it?

CSJ: 00006-03-134 has an estimated construction value of $112K, based on its TDLR filing.

Scope of Work

Rehabilitate Roadway, !-CST, Overlay and Limited Curb and Gutter

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

BUS 70-G TO ARIZONA ST, Sweetwater, TX, 79556

32.45219, -100.40748

Watch all construction in 79556 (Sweetwater)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Sweetwater?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.