FM 2986
FM 2986 is a new construction project at FROM US 181 TO FM 3239, Portland, in San Patricio County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jul 2020). The project has an estimated value of $714K.
๐Project Metrics
TDLR #EABPRJB8822887Project Closed
Project has been completed and closed
FM 2986 is a New Construction project located at FROM US 181 TO FM 3239, Portland, TX 78374 in Portland, Texas. The project has an estimated value of $714K. TXDOT DISTRICT: CORPUS CHRISTI is the property owner and ENTECH CIVIL ENGINEERS INC. is the design firm of record. The project was registered with TDLR on August 1, 2018.
โFrequently Asked Questions
What is FM 2986?
FM 2986 is a new construction project at FROM US 181 TO FM 3239 in Portland, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Upgrade roadway to a two lane roadway with a center turnlane.
Is FM 2986 open in Portland?
Construction on FM 2986 is complete โ TDLR records show the project passed its required accessibility inspection in Jul 2020. The building is finished and very likely open.
Where is FM 2986 located?
FM 2986 is located at FROM US 181 TO FM 3239, Portland, TX, 78374, in San Patricio County.
Who is the owner or developer of FM 2986?
TXDOT DISTRICT: CORPUS CHRISTI is the property owner/developer of record for FM 2986, per its TDLR project registration.
Who is the architect or design firm for FM 2986?
ENTECH CIVIL ENGINEERS INC. is the design firm of record for FM 2986, according to its TDLR filing.
How much does FM 2986 cost and how big is it?
FM 2986 has an estimated construction value of $714K, based on its TDLR filing.
๐Scope of Work
Upgrade roadway to a two lane roadway with a center turnlane.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Aug 1, 2018
Review Complete
Inspection Complete
Closed
Jul 1, 2020
๐Related Projects
๐คSame Owner
$37.03B total๐๏ธSame Design Firm
$571.5M totalProperty Owner
Design Firm
Registered Accessibility Specialist
Explore Area
Find Professionals
Need a contractor for this project?
Browse verified general contractors active in San Patricio County
Find General Contractors in San Patricio