FM 893 (CSJ: 1209-01-030) in Portland, TX
From: Stark Rd To: 0.2 MI W of CR 3567, Portland, TX, 78374
FM 893 (CSJ: 1209-01-030) is a new construction project at From: Stark Rd To: 0.2 MI W of CR 3567, Portland, in San Patricio County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Dec 2027. The project has an estimated value of $14.4M across about 109,791 sq ft.
- Estimated project value
- $14.4M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 109,791 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $131/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 2y 2mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
97 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
772 days after the preceding date shown.
Source: TDLR filing
View source record
📰About FM 893 (CSJ: 1209-01-030)
TxDOT District: Corpus Christi is upgrading FM 893 in Portland, San Patricio County, into a five-lane urban roadway with a center left-turn lane, sidewalks, and illumination. The project, filed as CSJ: 1209-01-030, involves new construction along a stretch from Stark Road to 0.2 miles west of CR 3567. The estimated cost is $14,374,262 for a site size of 109,791 sq ft, resulting in a cost per square foot of $131.
The scope includes realigning the intersection of FM 893 and CR 3567 to include dedicated left and right turn lanes as shown in plans. This work is funded by public funds, public land, or is a Federally funded roadway project. Johnson, Mimiran & Thompson, Inc. is the design firm of record, and Frank Fonseca is the registered accessibility specialist.
Project Status and Timeline
TDLR completed plan review in July 2025 and construction is scheduled to finish in December 2027, with work starting November 2025. The TDLR status is Review Complete. The project was registered with TDLR in July 2025. The scheduled build window is 772 days, which is longer than the county median of 243 days for new construction filings in San Patricio County.
In comparison to 297 TDLR-registered new construction filings in San Patricio County, this project's cost is above the county median for its type (in the top quarter). The median estimated cost for those filings is $1,100,000. The median size is 7,652 sq ft, and the median cost per square foot is $200. This project's $131 per square foot is below the county median of $200.
TxDOT District: Corpus Christi has six other TDLR-registered projects totaling $260,466,530. These include projects in Three Rivers, Gregory, Corpus Christi, and Riviera. Johnson, Mimiran & Thompson, Inc. has four other TDLR-registered projects totaling $8,187,076, located in Universal City, Bryan, and De Kalb. The area profile for ZIP 78374 shows a population of about 20,152 and a median household income of $81,580, according to U.S. Census ACS 2023 five-year estimates.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78374 (Portland)
One email per change. Unsubscribe in one click. Privacy.
FM 893 (CSJ: 1209-01-030) is a New Construction project located at From: Stark Rd To: 0.2 MI W of CR 3567 in Portland, Texas. The project has an estimated value of $14.4M covering 109,791 sq ft. TxDOT District: Corpus Christi is the property owner and Johnson, Mimiran & Thompson, Inc. is the design firm of record. The project was registered with TDLR on July 29, 2025.
Frequently Asked Questions
What is the estimated cost of the FM 893 upgrade in Portland?
The estimated cost is $14,374,262. This figure covers the new construction of a five-lane urban roadway, including sidewalks, illumination, and intersection realignment.
When is construction scheduled to start and finish?
Construction is scheduled to start in November 2025 and is scheduled to finish in December 2027. TDLR completed plan review in July 2025.
Who is the design firm for this project?
Johnson, Mimiran & Thompson, Inc. is the design firm of record. Frank Fonseca is the registered accessibility specialist for the project.
What is FM 893 (CSJ: 1209-01-030)?
FM 893 (CSJ: 1209-01-030) is a new construction project at From: Stark Rd To: 0.2 MI W of CR 3567 in Portland, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Upgrade to 5-lane urban roadway with center left turn lane, sidewalks and illumination. Realign the intersection of FM 893 and CR 3567 to include dedicated left and right turn lanes as shown in plans.
Is FM 893 (CSJ: 1209-01-030) open in Portland?
FM 893 (CSJ: 1209-01-030) is still under construction in Portland, TX, with an estimated completion of Dec 2027 according to its TDLR registration.
Where is FM 893 (CSJ: 1209-01-030) located?
FM 893 (CSJ: 1209-01-030) is located at From: Stark Rd To: 0.2 MI W of CR 3567, Portland, TX, 78374, in San Patricio County.
Who is the owner or developer of FM 893 (CSJ: 1209-01-030)?
TxDOT District: Corpus Christi is the property owner/developer of record for FM 893 (CSJ: 1209-01-030), per its TDLR project registration.
Who is the architect or design firm for FM 893 (CSJ: 1209-01-030)?
Johnson, Mimiran & Thompson, Inc. is the design firm of record for FM 893 (CSJ: 1209-01-030), according to its TDLR filing.
How much does FM 893 (CSJ: 1209-01-030) cost and how big is it?
FM 893 (CSJ: 1209-01-030) has an estimated construction value of $14.4M and approximately 109,791 square feet (about $131/sqft), based on its TDLR filing.
Scope of Work
Upgrade to 5-lane urban roadway with center left turn lane, sidewalks and illumination. Realign the intersection of FM 893 and CR 3567 to include dedicated left and right turn lanes as shown in plans.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
From: Stark Rd To: 0.2 MI W of CR 3567, Portland, TX, 78374
Related Projects
Watch all construction in 78374 (Portland)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Portland?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.