Project intelligenceTDLR TABS2025024649New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

SH 286 (CSJ: 0326-03-109) in Corpus Christi, TX

From: Horne Rd To: Baldwin Blvd, Corpus Christi, TX, 78415

Target date passed (Jul 2026)Review Complete

SH 286 (CSJ: 0326-03-109) is a new construction project at From: Horne Rd To: Baldwin Blvd, Corpus Christi, in Nueces County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Jul 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $1.5M across about 37,323 sq ft.

Estimated project value
$1.5M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
37,323 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$40/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
6 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jul 29, 2025337 days across supplied datesJul 1, 2026

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    156 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    181 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About SH 286 (CSJ: 0326-03-109)

The TDLR-registered project SH 286 (Csj: 0326-03-109) involves the new construction of curb ramps, sidewalks, and miscellaneous pedestrian elements along a corridor in Corpus Christi. The work is scheduled to run from Horne Rd to Baldwin Blvd in the 78415 ZIP code within Nueces County. This infrastructure upgrade is designed to improve pedestrian accessibility across the specified stretch of roadway.

With an estimated cost of $1,500,000 and a total area of 37,323 sq ft, the project translates to a cost of $40 per sq ft. The owner of record is TxDOT District: Corpus Christi, which manages several other significant transportation projects in the region. Kimley-Horn serves as the design firm of record, bringing professional engineering oversight to the planning and execution phases of this public works initiative.

Project Scope and Financial Context

The scope is strictly limited to pedestrian infrastructure, including the installation of curb ramps and sidewalks. This focus distinguishes it from broader roadway paving projects. At $1,500,000, the estimated cost is above the county median for new construction filings in Nueces County, which stands at $663,432. However, the cost per square foot is below the county median of $118, reflecting the specialized nature of accessibility improvements compared to general building construction.

TDLR completed plan review in July 2025. Construction was scheduled to begin in January 2026 and finish in July 2026. Although the scheduled completion date has passed, TDLR has not yet recorded a final inspection. This status indicates that the public record does not yet confirm the physical completion of the work or the final acceptance of the site by regulatory authorities.

Local Context and Registration

The project is registered with TDLR as a Federally funded roadway project involving public funds and land. The registered accessibility specialist for this filing is Frank Fonseca. In the same area, other registered projects include various new construction and renovation efforts, such as RTA Bus Stops and Dollar General locations. The ZIP code 78415 has a population of about 42,831, with a median household income of $51,970 according to U.S. Census ACS 2022 estimates.

Kimley-Horn has six other TDLR-registered projects totaling $196,845,395, ranging from small renovations to large-scale developments like the Red River Rise Lodge. TxDOT District: Corpus Christi has six other registered projects totaling $273,340,792, including major highway improvements in Three Rivers and Portland. These figures demonstrate the scale of public infrastructure investment managed by these entities in the region.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78415 (Corpus Christi)

One email per change. Unsubscribe in one click. Privacy.

SH 286 (CSJ: 0326-03-109) is a New Construction project located at From: Horne Rd To: Baldwin Blvd, Corpus Christi, TX 78415 in Corpus Christi, Texas. The project has an estimated value of $1.5M covering 37,323 sq ft. TxDOT District: Corpus Christi is the property owner and Kimley-Horn is the design firm of record. The project was registered with TDLR on July 29, 2025.

Frequently Asked Questions

Is the project finished?

TDLR has not yet recorded a final inspection. While the scheduled completion date was July 2026, the public record does not confirm that the site is complete or accepted.

Who is building this project?

The owner of record is TxDOT District: Corpus Christi. Kimley-Horn is the design firm of record responsible for the project's engineering and design.

What is included in the scope of work?

The scope includes the construction of curb ramps, sidewalks, and miscellaneous pedestrian elements. It does not include full roadway paving or structural bridge work.

How much does the project cost?

The estimated cost is $1,500,000. This amount is above the Nueces County median for new construction but has a lower cost per square foot than the county average.

Where exactly is the work located?

The work runs from Horne Rd to Baldwin Blvd in Corpus Christi, TX 78415. This location is within Nueces County and falls under the jurisdiction of TxDOT District: Corpus Christi.

What is SH 286 (CSJ: 0326-03-109)?

SH 286 (CSJ: 0326-03-109) is a new construction project at From: Horne Rd To: Baldwin Blvd in Corpus Christi, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construction of curb ramps, sidewalks and miscellaneous pedestrian elements.

Is SH 286 (CSJ: 0326-03-109) open in Corpus Christi?

SH 286 (CSJ: 0326-03-109) was scheduled to finish construction in Jul 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is SH 286 (CSJ: 0326-03-109) located?

SH 286 (CSJ: 0326-03-109) is located at From: Horne Rd To: Baldwin Blvd, Corpus Christi, TX, 78415, in Nueces County.

Who is the owner or developer of SH 286 (CSJ: 0326-03-109)?

TxDOT District: Corpus Christi is the property owner/developer of record for SH 286 (CSJ: 0326-03-109), per its TDLR project registration.

Who is the architect or design firm for SH 286 (CSJ: 0326-03-109)?

Kimley-Horn is the design firm of record for SH 286 (CSJ: 0326-03-109), according to its TDLR filing.

How much does SH 286 (CSJ: 0326-03-109) cost and how big is it?

SH 286 (CSJ: 0326-03-109) has an estimated construction value of $1.5M and approximately 37,323 square feet (about $40/sqft), based on its TDLR filing.

Scope of Work

Construction of curb ramps, sidewalks and miscellaneous pedestrian elements.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

From: Horne Rd To: Baldwin Blvd, Corpus Christi, TX, 78415

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 78415 (Corpus Christi)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Corpus Christi?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.