VERITEX BANK LEVEL 4
VERITEX BANK LEVEL 4 is a renovation/alteration project at 8214 WESTCHESTER DRIVE, Dallas, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Nov 2018). The project has an estimated value of $200K.
๐Project Metrics
TDLR #EABPRJB9801171Project Closed
Project has been completed and closed
VERITEX BANK LEVEL 4 is a Renovation/Alteration project located at 8214 WESTCHESTER DRIVE, Dallas, TX 75225 in Dallas, Texas. The project has an estimated value of $200K. VERITEX BANK is the property owner and CORGAN is the design firm of record. The project was registered with TDLR on September 19, 2018.
โFrequently Asked Questions
What is VERITEX BANK LEVEL 4?
VERITEX BANK LEVEL 4 is a renovation/alteration project at 8214 WESTCHESTER DRIVE in Dallas, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation of Level 4, approximately 5,300 square feet.
Is VERITEX BANK LEVEL 4 open in Dallas?
Construction on VERITEX BANK LEVEL 4 is complete โ TDLR records show the project passed its required accessibility inspection in Nov 2018. The building is finished and very likely open.
Where is VERITEX BANK LEVEL 4 located?
VERITEX BANK LEVEL 4 is located at 8214 WESTCHESTER DRIVE, Dallas, TX, 75225, in Dallas County.
Who is the owner or developer of VERITEX BANK LEVEL 4?
VERITEX BANK is the property owner/developer of record for VERITEX BANK LEVEL 4, per its TDLR project registration.
Who is the architect or design firm for VERITEX BANK LEVEL 4?
CORGAN is the design firm of record for VERITEX BANK LEVEL 4, according to its TDLR filing.
How much does VERITEX BANK LEVEL 4 cost and how big is it?
VERITEX BANK LEVEL 4 has an estimated construction value of $200K, based on its TDLR filing.
๐Scope of Work
Renovation of Level 4, approximately 5,300 square feet.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Sep 19, 2018
Review Complete
Inspection Complete
Closed
Nov 1, 2018