Funding type
This project is privately funded, on private land for private use.
Rockwall ISD Ursula Rakow Middle School Parking Lot Addition
4700 Gettysburg Blvd, Rockwall, TX, 75032
Rockwall ISD Ursula Rakow Middle School Parking Lot Addition is a new construction project at 4700 Gettysburg Blvd, Rockwall, in Rockwall County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2026). The project has an estimated value of $495K across about 116,740 sq ft.
- Estimated project value
- $495K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 116,740 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $4/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 6 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
5 timeline dates shown.
Scheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Source: TDLR filing
View source recordProject registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
157 days after the preceding date shown.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
20 days after the preceding date shown.
Source: TDLR filing
View source recordInspection complete · TDLR filing
The filing records completion of the accessibility inspection.
21 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Rockwall ISD Ursula Rakow Middle School Parking Lot Addition
The Rockwall ISD Ursula Rakow Middle School Parking Lot Addition project is complete. Located at 4700 Gettysburg Blvd in Rockwall, this new construction project added 116,740 square feet of paved surface to the school campus. The work was registered with the Texas Department of Licensing and Regulation (TDLR) in June 2026, and the record shows the final TDLR accessibility inspection was passed in August 2026.
Project Scope and Cost
The filing describes the scope of work strictly as a parking lot addition. The estimated cost for this specific project was $495,000. This figure is below the median estimated cost of $950,000 for new construction filings in Rockwall County over the last 24 months. The cost per square foot is calculated at $4, which is significantly below the county median of $142 per square foot for similar filings. The scheduled build window was 177 days, shorter than the county median of 242 days.
Rockwall ISD is the owner of record. The design firm listed on the filing is Corgan, a firm with a substantial portfolio of other TDLR-registered projects in the region. The registered accessibility specialist for this project is Brittany Lynn Miller. The project is privately funded on private land for private use, consistent with the district's ownership of the property.
Location and Context
The site is in Rockwall County, ZIP code 75032. According to U.S. Census American Community Survey 2023 five-year estimates, the ZIP code has a population of about 37,895 and a median household income of $128,465. The area is predominantly owner-occupied, with a median home value of $462,000.
Rockwall ISD has six other TDLR-registered projects totaling $81,980,000, including the Cain Middle School and Reinhardt Elementary School projects, both of which are closed or complete. Corgan has six other registered projects totaling $507,300,000, including major high school and career center projects in Dallas and Garland. The construction start date per the filing was January 2026, with a planned completion of July 2026. The final inspection passed in August 2026, confirming the project status as Inspection Complete.
Inspection Complete
Final inspection completed, awaiting project closure
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 75032 (Rockwall)
One email per change. Unsubscribe in one click. Privacy.
Rockwall ISD Ursula Rakow Middle School Parking Lot Addition is a New Construction project located at 4700 Gettysburg Blvd, Rockwall, TX 75032 in Rockwall, Texas. The project has an estimated value of $495K covering 116,740 sq ft. ROCKWALL ISD is the property owner and CORGAN is the design firm of record. The project was registered with TDLR on June 26, 2026.
Frequently Asked Questions
Is the parking lot addition complete?
Yes, the project passed its final TDLR accessibility inspection in August 2026. The TDLR status is Inspection Complete, confirming the construction is finished.
Who designed the parking lot addition?
Corgan is the design firm of record for this project. They are also listed on other large-scale school and career center projects in the region.
How much did the project cost?
The estimated cost for the parking lot addition was $495,000. This is below the median cost of $950,000 for new construction projects in Rockwall County.
Who is the owner of the project?
Rockwall ISD is the owner and developer of record. The project is located on private land for private use.
What is Rockwall ISD Ursula Rakow Middle School Parking Lot Addition?
Rockwall ISD Ursula Rakow Middle School Parking Lot Addition is a new construction project at 4700 Gettysburg Blvd in Rockwall, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: PARKING LOT ADDITION
Is Rockwall ISD Ursula Rakow Middle School Parking Lot Addition open in Rockwall?
Construction on Rockwall ISD Ursula Rakow Middle School Parking Lot Addition is complete — TDLR records show the project passed its required accessibility inspection in Aug 2026. The building is finished and very likely open.
Where is Rockwall ISD Ursula Rakow Middle School Parking Lot Addition located?
Rockwall ISD Ursula Rakow Middle School Parking Lot Addition is located at 4700 Gettysburg Blvd, Rockwall, TX, 75032, in Rockwall County.
Who is the owner or developer of Rockwall ISD Ursula Rakow Middle School Parking Lot Addition?
ROCKWALL ISD is the property owner/developer of record for Rockwall ISD Ursula Rakow Middle School Parking Lot Addition, per its TDLR project registration.
Who is the architect or design firm for Rockwall ISD Ursula Rakow Middle School Parking Lot Addition?
CORGAN is the design firm of record for Rockwall ISD Ursula Rakow Middle School Parking Lot Addition, according to its TDLR filing.
How much does Rockwall ISD Ursula Rakow Middle School Parking Lot Addition cost and how big is it?
Rockwall ISD Ursula Rakow Middle School Parking Lot Addition has an estimated construction value of $495K and approximately 116,740 square feet (about $4/sqft), based on its TDLR filing.
Scope of Work
PARKING LOT ADDITION
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
4700 Gettysburg Blvd, Rockwall, TX, 75032
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$615.6M totalWatch all construction in 75032 (Rockwall)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Rockwall?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.