NewCo
NewCo is a renovation/alteration project at 7300 FM 2222, Suite 120, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2019). The project has an estimated value of $787K across about 18,722 sq ft.
๐Project Metrics
TDLR #TABS2019001533Project Closed
Project has been completed and closed
NewCo is a Renovation/Alteration project located at 7300 FM 2222, Suite 120, Austin, TX 78730 in Austin, Texas. The project has an estimated value of $787K covering 18,722 sq ft. Rovira, Inc is the property owner and Urban Foundry Architecture is the design firm of record. The project was registered with TDLR on December 21, 2018.
โFrequently Asked Questions
What is NewCo?
NewCo is a renovation/alteration project at 7300 FM 2222, Suite 120 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Partial Floor Interior Remodel
Is NewCo open in Austin?
Construction on NewCo is complete โ TDLR records show the project passed its required accessibility inspection in Apr 2019. The building is finished and very likely open.
Where is NewCo located?
NewCo is located at 7300 FM 2222, Suite 120, Austin, TX, 78730, in Travis County.
Who is the owner or developer of NewCo?
Rovira, Inc is the property owner/developer of record for NewCo, per its TDLR project registration.
Who is the architect or design firm for NewCo?
Urban Foundry Architecture is the design firm of record for NewCo, according to its TDLR filing.
How much does NewCo cost and how big is it?
NewCo has an estimated construction value of $787K and approximately 18,722 square feet (about $42/sqft), based on its TDLR filing.
๐Scope of Work
Partial Floor Interior Remodel
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Dec 21, 2018
Review Complete
Inspection Complete
Closed
Apr 23, 2019
๐Related Projects
๐คSame Owner
$4.4M total๐๏ธSame Design Firm
$449.8M total๐Related City Permits
Building permits found at or near this location
Express- Foundation repair. Install 24 Exterior and 13 Interior Pilings
New pool
New 2-story single family residence 3 bed/2.5 bath with attached garage covered front porch and covered rear patio Green Building
temporary tpole for new construction in Easton Park
New 2-story single family residence 3 bed/2.5 bath with attached garage covered front porch and covered rear patio Green Building