๐Ÿ“Review Complete๐Ÿ”ง Alteration/Renovation๐Ÿ’ต This project involves public funds, public land, or is a Federally funded roadway project.

ERCOT Taylor

800 Airport Rd, Taylor, TX, 76574
Construction50%

๐Ÿ“ŠProject Metrics

TDLR #TABS2025023289
$14.5M
Project Value
111,226
Square Feet
$130/sqft
Cost/SqFt
1y 1mo
Duration
Registered:Jul 11, 2025
Start:Aug 12, 2025
Target:Sep 10, 2026
Remaining:258 days
๐Ÿ“

Review Complete

Design review complete, construction may proceed

๐Ÿ“‹Scope of Work

Scope of work to include demo of existing walls, ceilings, and finishes; replacing or removing existing MEP systems and items; and construction of new walls, doors, ceilings, finishes, and MEP items in two existing two story buildings.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

๐Ÿ“…Compliance Timeline

Project Registered
July 11, 2025
Review Complete
July 11, 2025
Construction Start
August 12, 2025
Expected Completion
September 10, 2026

๐Ÿ“Location & Views

Open in MapsGet Directions|30.57627, -97.44169

๐Ÿ“„Related City Permits

Building permits found at or near this location

8001 CIRCUIT OF THE AMERICAS BLVD UNIT 905
31.87 mi away

Interior finish out.

FinalMechanical PermitRemodelDec 2025
View Details
2025-096712 MP
๐Ÿ”งVertex Mechanical LLC
8001 CIRCUIT OF THE AMERICAS BLVD UNIT 702
31.87 mi away

Interior finish out. [7 Day Review]

FinalMechanical PermitRemodelDec 2025
View Details
2025-096790 MP
๐Ÿ”งVertex Mechanical LLC
800 CEDAR GLN
32.45 mi away

interior remodel - Home Remodel -Under house plumbing system replacement -new flooring for the house 1900 sqm -Wall and ceiling repair -replace 35ยฟx47ยฟ window with the same size and same location Kitchen Remodel -ceiling to be raised 12 -appliances and fixtures will be all same location -hood to run new dedicated wiring and new exhaust duct -new AFCI outlets per code -4 new recessed ceiling light 1 pendant light and 1 dimmer switch -new cabinetry countertop and tiles Master Bathroom Remodel -frame new shower pan and shampoo niche -fixtures all the same location -install 2 GFCI outlets -install 2 recessed light -new cabinets countertops and tiles Second Floor Bathroom Remodel -frame new shampoo niche -toilet to be relocated -other bathroom fixtures will stay -install 2 GFCI outlets -install 1 recessed light Office Renovatiom -install walls insulation and ceiling for the new office room -install one electrical outlet on each wall per code -install one ceiling fan/light combo -flooring installation -demolish existing wall section for new windows -Install 4 new AC supply grills and extend ductwork and connect to the main HVAC System and Airhandler Bathroom Addition -Remove existing wall separating the future bathroom space from the living area to create the new layout -Install a structural wood beam to support the load-bearing requirements of the removed wall. -Frame and install new walls as per plans -install wall tiles cabinets paint walls -Install fixtures as per plans Master Bedroom Remodel -Extend Master Bedroom Closet as per design layout -install 2 new outlets as per code -install 3 recessed LED Lights and wirings Laundry Remodel -remove existing door and create new access door to water heater tank -install new cabinets

ActiveElectrical PermitAddition and RemodelDec 2025
View Details
2025-133059 EP
๐Ÿ”งPinPoint Electrical Systems
8005 PONCHO PASS
36.31 mi away

Irrigation Installation

ActivePlumbing PermitIrrigationDec 2025
View Details
2025-160650 PP
8007 PONCHO PASS
36.31 mi away

Irrigation Installation

ActivePlumbing PermitIrrigationDec 2025
View Details
2025-160652 PP

Quick Actions

TDLR ID: TABS2025023289

Registered Accessibility Specialist

๐Ÿ“‹
WILLIAM G,PAGE
RAS #1240
1504 NORSEMAN TERR, AUSTIN, TX 78758