AISD Renovations at Reagan High School
๐Project Metrics
TDLR #TABS2019003021Project Closed
Project has been completed and closed
๐Scope of Work
Replace old and outdated electrical equipment and replace old water coolers. Civil site drainage improvements.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐Related City Permits
Building permits found at or near this location
New pool spa and concrete deck
Express- Replace tub to shower 1 piece prefabricated acrylic no electrical work needed replace valve with new shower valve only working in wet space.
Express- Replace tub to shower 1 piece prefabricated acrylic no electrical work needed replace valve with new shower valve only working in wet space.
Water & Wastewater Installation - ref SP-2024-0426CX* Installation of new 8-inch waterline PVC approximately 558 LF Installation of new 2-inch waterline PVC approximately 364 LF Installation of new 2.5 inch waterline PVC approximately 171 LF Installation of new 4 inch wastewater line PVC SDR-26 approximately 133 LF Installation of new 6 inch wastewater line PVC SDR-26 approximately 453 LF Installation of new 10 inch wastewater line PVC approximately 506 LF Installation of 7 new wastewater manholes
Installation on the onsite underground fire line piping. SP-2024-0426CX.