AISD Nelson Field Additions & Renovations (Phase 1) is a renovation/alteration project at 7105 Berkman Drive, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Feb 2027. The project has an estimated value of $6.8M across about 2,735 sq ft.

Estimated project value
$6.8M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
2,735 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$2.49K/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
8 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

May 21, 2026270 days across supplied datesFeb 15, 2027

3 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    42 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    228 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About AISD Nelson Field Additions & Renovations (Phase 1)

Austin Independent School District is undertaking a $6,800,000 renovation and alteration project at Nelson Field, located at 7105 Berkman Drive in Austin. The filing, titled AISD Nelson Field Additions & Renovations (Phase 1), outlines specific upgrades to the baseball facility, including the replacement of existing turf and the installation of two new batting cages. The scope also covers renovations and additions to two existing dugouts and the installation of new field lighting. The total building size associated with the project is 2,735 sq ft, with 2,345 sq ft designated as added or new space and 390 sq ft as remodeled space.

The project was registered with TDLR in May 2026. Plan review is pending, and the construction completion is targeted for February 2027. The scheduled build window is 228 days, which is longer than the 98-day median for renovation and alteration projects in Travis County. The estimated cost places this project above the county median of $298,000 for similar filings, situating it in the top quarter of costs for this work type in the region.

Design and Ownership

Stantec Architecture, Inc. is the design firm of record for this project. The firm has six other TDLR-registered projects totaling $12,330,000, including work at Gattis Elementary School in Round Rock and Pond Springs Elementary School in Austin. Austin Independent School District is the owner of record and has six other registered projects totaling $8,112,002, such as the Noack Sports Complex and Burger Baseball Stadium. Mark S Robinson is the registered accessibility specialist for this filing.

The project involves public funds and public land. The estimated cost per square foot is $2,486, which is above the Travis County median of $103 per square foot for renovation and alteration filings. The area profile for ZIP code 78723 indicates a population of about 37,000 and a median household income of $81,986, according to U.S. Census ACS 2022 five-year estimates. The Travis County unemployment rate was 3.9 percent in July 2026, per FRED data.

Third-party listings on ConstructConnect describe the project as demolition, remodeling, renovation, and addition to a stadium in Austin, Texas. The project status is listed as Project Registered, with construction start scheduled for July 2026.

Project Registered

Project has been registered with TDLR and is in pre-construction phase

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78723 (Austin)

One email per change. Unsubscribe in one click. Privacy.

AISD Nelson Field Additions & Renovations (Phase 1) is a Renovation/Alteration project located at 7105 Berkman Drive, Austin, TX 78723 in Austin, Texas. The project has an estimated value of $6.8M covering 2,735 sq ft. Austin Independent School District is the property owner and Stantec Architecture, Inc. is the design firm of record. The project was registered with TDLR on May 21, 2026.

Frequently Asked Questions

What is the estimated cost of the AISD Nelson Field renovation?

The estimated cost for the AISD Nelson Field Additions & Renovations (Phase 1) project is $6,800,000. This figure is derived from the TDLR registration filing for the renovation and alteration work at 7105 Berkman Drive in Austin.

Who is the design firm for this project?

Stantec Architecture, Inc. is the design firm of record for the AISD Nelson Field project. The firm is also responsible for other registered projects in Austin and Round Rock, including work at Gattis Elementary School and Pond Springs Elementary School.

When is the construction targeted for completion?

The project completion is targeted for February 2027. The project was registered with TDLR in May 2026, and the scheduled construction start date is July 2026, with a build window of 228 days.

What specific improvements are included in the scope of work?

The scope includes replacing existing baseball field turf, installing two new batting cages, renovating and adding to two existing dugouts, and installing new baseball field lighting. The project adds 2,345 sq ft of new space.

Is the project currently open to the public?

The project is under construction with a targeted completion date of February 2027. The TDLR record indicates the project is registered and plan review is pending, but it does not indicate that the facility is open for public use.

What is AISD Nelson Field Additions & Renovations (Phase 1)?

AISD Nelson Field Additions & Renovations (Phase 1) is a renovation/alteration project at 7105 Berkman Drive in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Replace existing baseball field turf. Install two (2) new batting cages. Renovations and additions to two (2) existing baseball field dugouts. Install new baseball field lighting. Added/New SF: 2,345 SF | Remodeled SF: 390 SF | Total SF…

Is AISD Nelson Field Additions & Renovations (Phase 1) open in Austin?

AISD Nelson Field Additions & Renovations (Phase 1) is still under construction in Austin, TX, with an estimated completion of Feb 2027 according to its TDLR registration.

Where is AISD Nelson Field Additions & Renovations (Phase 1) located?

AISD Nelson Field Additions & Renovations (Phase 1) is located at 7105 Berkman Drive, Austin, TX, 78723, in Travis County.

Who is the owner or developer of AISD Nelson Field Additions & Renovations (Phase 1)?

Austin Independent School District is the property owner/developer of record for AISD Nelson Field Additions & Renovations (Phase 1), per its TDLR project registration.

Who is the architect or design firm for AISD Nelson Field Additions & Renovations (Phase 1)?

Stantec Architecture, Inc. is the design firm of record for AISD Nelson Field Additions & Renovations (Phase 1), according to its TDLR filing.

How much does AISD Nelson Field Additions & Renovations (Phase 1) cost and how big is it?

AISD Nelson Field Additions & Renovations (Phase 1) has an estimated construction value of $6.8M and approximately 2,735 square feet (about $2.49K/sqft), based on its TDLR filing.

Scope of Work

Replace existing baseball field turf. Install two (2) new batting cages. Renovations and additions to two (2) existing baseball field dugouts. Install new baseball field lighting. Added/New SF: 2,345 SF | Remodeled SF: 390 SF | Total SF of Buildings:

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

7105 Berkman Drive, Austin, TX, 78723

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Related City Permits

Building permits found at or near this location

7105 BERKMAN DR

ePlan: Commercial Expedited Review - Renovation and Addition to 2 Existing Dugouts Installation of New Lightning and New Batting Cages and Replacement of Field Turf (2735 SF)

ActiveBuilding PermitAddition and RemodelNov 2026
$6.8M
View Details
2026-145374 BP
Cadence McShane Construction **MAIN**
7105 LOCH LOMMOND ST

Upgrade service 200amp service

FinalElectrical PermitUpgradeOct 2026
View Details
2026-137137 EP
Edumar Electric
7105 NUTRIA RUN

Express: bathroom remodeling. the client hired us after he demo the space. we are going to create walk in shower installing vanity Installing Toilet shower fixtures drywall tile flooring tile shower walls. layout to stay the same.

ActiveElectrical PermitRepairOct 2026
View Details
2026-111194 EP
Revive Electric LLC
7105 TEYA CT

Interior remodel of SFR

ActiveElectrical PermitAddition and RemodelOct 2026
View Details
2026-126204 EP
Beltran Electric
7105 NUTRIA RUN

Express: bathroom remodeling. the client hired us after he demo the space. we are going to create walk in shower installing vanity Installing Toilet shower fixtures drywall tile flooring tile shower walls. layout to stay the same.

ActivePlumbing PermitRepairOct 2026
View Details
2026-111194 PP
Green Valley Plumbing LLC

Watch all construction in 78723 (Austin)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.