Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
Davis Elementary School Special Education Restroom Renovation
5214 Duval Rd, Austin, TX, 78727
Davis Elementary School Special Education Restroom Renovation is a renovation/alteration project at 5214 Duval Rd, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Mar 2027. The project has an estimated value of $130K across about 119 sq ft.
- Estimated project value
- $130K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 119 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $1.09K/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 3 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
3 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
112 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
84 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Davis Elementary School Special Education Restroom Renovation
Austin Independent School District is renovating two existing restrooms into a single ADA accessible restroom at Davis Elementary School, located at 5214 Duval Rd in Austin. The project, filed as the Davis Elementary School Special Education Restroom Renovation, covers a small footprint of 119 sq ft with an estimated cost of $130,000.
The work is classified as a Renovation/Alteration involving public funds. Alta Architects serves as the design firm of record, while Stephen A Meyer is the registered accessibility specialist. The project was registered with TDLR in September 2026, and construction is scheduled to begin in January 2027.
Project Scope and Cost
The filing specifies the renovation of two existing restrooms into a single ADA accessible restroom. With an estimated cost of $130,000 for 119 sq ft, the cost per square foot is $1092. This figure is above the Travis County median of $103 per square foot for similar renovation and alteration filings. The total estimated cost is below the county median of $297,008, placing it in the bottom quarter of comparable projects in the area.
The scheduled build window is 84 days, which is close to the county median of 98 days for this type of work. The project is targeted for March 2027 completion. The TDLR status is Project Registered, with plan review pending.
Owner and Design Context
Austin Independent School District holds six other TDLR-registered projects totaling $8,298,002, including the Burger Baseball Stadium and Noack Sports Complex. Alta Architects has six other registered projects totaling $65,533,600, including the UTSA San Pedro II and Laredo Multipurpose Building. These figures reflect the broader portfolio of work by the owner and design firm in Texas.
City of Austin permit records show four permits on file at this street address, issued between April 2025 and May 2025. These include Mechanical, Plumbing, Electrical, and Building permits, all with a final status. The most recent permit description involves enclosing an existing entryway to create an exterior secure vestibule.
Project Registered
Project has been registered with TDLR and is in pre-construction phase
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78727 (Austin)
One email per change. Unsubscribe in one click. Privacy.
Davis Elementary School Special Education Restroom Renovation is a Renovation/Alteration project located at 5214 Duval Rd, Austin, TX 78727 in Austin, Texas. The project has an estimated value of $130K covering 119 sq ft. Austin Independent School District is the property owner and Alta Architects is the design firm of record. The project was registered with TDLR on September 14, 2026.
Frequently Asked Questions
What is the scope of the Davis Elementary School renovation?
The scope involves renovating two existing restrooms into a single ADA accessible restroom. The project covers 119 sq ft and has an estimated cost of $130,000.
Who is the owner and design firm for this project?
The owner of record is Austin Independent School District. Alta Architects is the design firm, and Stephen A Meyer is the registered accessibility specialist.
When is the Davis Elementary School restroom renovation targeted for completion?
The project is targeted for March 2027 completion. Construction is scheduled to begin in January 2027, following registration with TDLR in September 2026.
How does the cost per square foot compare to the county median?
The cost per square foot is $1092, which is above the Travis County median of $103 for renovation and alteration filings. The total cost is below the county median.
Is the Davis Elementary School project currently open or operating?
The project is a construction renovation with a status of Project Registered. It is targeted for March 2027 completion, and plan review is pending.
What is Davis Elementary School Special Education Restroom Renovation?
Davis Elementary School Special Education Restroom Renovation is a renovation/alteration project at 5214 Duval Rd in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation of two existing restrooms into a single ADA accessible restroom.
Is Davis Elementary School Special Education Restroom Renovation open in Austin?
Davis Elementary School Special Education Restroom Renovation is still under construction in Austin, TX, with an estimated completion of Mar 2027 according to its TDLR registration.
Where is Davis Elementary School Special Education Restroom Renovation located?
Davis Elementary School Special Education Restroom Renovation is located at 5214 Duval Rd, Austin, TX, 78727, in Travis County.
Who is the owner or developer of Davis Elementary School Special Education Restroom Renovation?
Austin Independent School District is the property owner/developer of record for Davis Elementary School Special Education Restroom Renovation, per its TDLR project registration.
Who is the architect or design firm for Davis Elementary School Special Education Restroom Renovation?
Alta Architects is the design firm of record for Davis Elementary School Special Education Restroom Renovation, according to its TDLR filing.
How much does Davis Elementary School Special Education Restroom Renovation cost and how big is it?
Davis Elementary School Special Education Restroom Renovation has an estimated construction value of $130K and approximately 119 square feet (about $1.09K/sqft), based on its TDLR filing.
Scope of Work
Renovation of two existing restrooms into a single ADA accessible restroom.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
5214 Duval Rd, Austin, TX, 78727
Related Projects
Same Owner
$8.0M totalRelated City Permits
Building permits found at or near this location
ENCLOSING EXISTING ENTRYWAY TO CREATE EXTERIOR SECURE VESTIBULE SECURING EXISTING RECEPTION AREA TO IMPROVE CONTROL OVER ACCESS TO INTERIOR OF SCHOOL ADDITION OF SECURITY HARDWARE TO NEW VESTIBULE space and reception.
ENCLOSING EXISTING ENTRYWAY TO CREATE EXTERIOR SECURE VESTIBULE SECURING EXISTING RECEPTION AREA TO IMPROVE CONTROL OVER ACCESS TO INTERIOR OF SCHOOL ADDITION OF SECURITY HARDWARE TO NEW VESTIBULE space and reception.
ENCLOSING EXISTING ENTRYWAY TO CREATE EXTERIOR SECURE VESTIBULE SECURING EXISTING RECEPTION AREA TO IMPROVE CONTROL OVER ACCESS TO INTERIOR OF SCHOOL ADDITION OF SECURITY HARDWARE TO NEW VESTIBULE space and reception.
ENCLOSING EXISTING ENTRYWAY TO CREATE EXTERIOR SECURE VESTIBULE SECURING EXISTING RECEPTION AREA TO IMPROVE CONTROL OVER ACCESS TO INTERIOR OF SCHOOL ADDITION OF SECURITY HARDWARE TO NEW VESTIBULE space and reception.
Flooring repairs (installing proper vapor barrier for flooring and replacing assoc. damaged flooring with LVT. Updating non-functioning Heating and Air conditioning.
Related Site Plans
City of Austin site plan approvals at this location
Watch all construction in 78727 (Austin)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Austin?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.