Town East Blvd. Reconstruction from US 80 to Skyline Drive
Town East Blvd. Reconstruction from US 80 to Skyline Drive is a renovation/alteration project at US 80 to Skyline Drive, Mesquite, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2021). The project has an estimated value of $14.5M across about 589,113 sq ft.
๐Project Metrics
TDLR #TABS2019009722Project Closed
Project has been completed and closed
Town East Blvd. Reconstruction from US 80 to Skyline Drive is a Renovation/Alteration project located at US 80 to Skyline Drive, Mesquite, TX 75149 in Mesquite, Texas. The project has an estimated value of $14.5M covering 589,113 sq ft. City of Mesquite is the property owner and Criado & Associates, Inc. is the design firm of record. The project was registered with TDLR on April 18, 2019.
โFrequently Asked Questions
What is Town East Blvd. Reconstruction from US 80 to Skyline Drive?
Town East Blvd. Reconstruction from US 80 to Skyline Drive is a renovation/alteration project at US 80 to Skyline Drive in Mesquite, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Demolition, paving, signage & pavement marking, storm drain construction, water reconstruction, street lighting & traffic signaling, landscape & irrigation, and traffic control.
Is Town East Blvd. Reconstruction from US 80 to Skyline Drive open in Mesquite?
Construction on Town East Blvd. Reconstruction from US 80 to Skyline Drive is complete โ TDLR records show the project passed its required accessibility inspection in Dec 2021. The building is finished and very likely open.
Where is Town East Blvd. Reconstruction from US 80 to Skyline Drive located?
Town East Blvd. Reconstruction from US 80 to Skyline Drive is located at US 80 to Skyline Drive, Mesquite, TX, 75149, in Dallas County.
Who is the owner or developer of Town East Blvd. Reconstruction from US 80 to Skyline Drive?
City of Mesquite is the property owner/developer of record for Town East Blvd. Reconstruction from US 80 to Skyline Drive, per its TDLR project registration.
Who is the architect or design firm for Town East Blvd. Reconstruction from US 80 to Skyline Drive?
Criado & Associates, Inc. is the design firm of record for Town East Blvd. Reconstruction from US 80 to Skyline Drive, according to its TDLR filing.
How much does Town East Blvd. Reconstruction from US 80 to Skyline Drive cost and how big is it?
Town East Blvd. Reconstruction from US 80 to Skyline Drive has an estimated construction value of $14.5M and approximately 589,113 square feet (about $25/sqft), based on its TDLR filing.
๐Scope of Work
Demolition, paving, signage & pavement marking, storm drain construction, water reconstruction, street lighting & traffic signaling, landscape & irrigation, and traffic control.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Apr 18, 2019
Review Complete
Inspection Complete
Closed
Dec 1, 2021