Project intelligenceTDLR TABS2026024150Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Paving and Utility Improvements for San Marcus, Diane, & Barbara in Mesquite, TX

San Marcus Ave, Diane Dr, Barbara St, Mesquite, TX, 75149

Target date passed (Sep 2026)Review Complete

Paving and Utility Improvements for San Marcus, Diane, & Barbara is a renovation/alteration project at San Marcus Ave, Diane Dr, Barbara St, Mesquite, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Sep 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $89K across about 1,021 sq ft.

Estimated project value
$89K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
1,021 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$87/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
5 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

Explore the linked construction record and source history

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

May 1, 2026150 days across supplied datesSep 28, 2026

4 timeline dates shown.

  1. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Source: TDLR filing

    View source record
  2. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    60 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    37 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    53 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Paving and Utility Improvements for San Marcus, Diane, & Barbara

Paving and Utility Improvements for San Marcus, Diane, & Barbara is a City of Mesquite project renovating residential streets in the 75149 ZIP code. The work covers San Marcus Avenue, Diane Drive, and Barbara Street, involving full street reconstruction including the replacement of sidewalks, curb ramps, and driveways. The scope also includes replacing existing water mains along a 1,021 linear foot stretch of San Marcus Avenue. The total estimated cost is $89,000, equating to $87 per square foot for the 1,021 square feet of work area.

TDLR completed plan review in August 2026 and construction is scheduled to finish in September 2026, with work starting May 2026. The registration was filed in June 2026, and the current status is Review Complete. This timeline represents a 150-day build window, which is longer than the 92-day median for similar renovation and alteration projects in Dallas County.

Project Scope and Cost Context

The work is classified as a Renovation/Alteration project. The estimated cost of $89,000 is below the county median of $249,000 for comparable filings, placing it in the bottom quarter of costs. However, the cost per square foot of $87 is above the county median of $72. This indicates a higher density of utility and paving work relative to the total area. The project involves public funds and public land, qualifying it as a Federally funded roadway project under the registration criteria.

Sharlynn L Keys is the registered accessibility specialist for this filing. The City of Mesquite is the owner of record. This project is one of six other TDLR-registered projects for the city, which collectively total over $24 million in value. Those other projects include the Mesquite Convention Center, the Mesquite Heritage Trail Phase 2, and the Military Parkway Trail, all of which have completed inspections or reviews. This specific street project focuses on local residential infrastructure rather than large-scale civic facilities.

Local Area and Labor Market

The project is located in a ZIP code with a population of about 58,849 residents. Census estimates for the area indicate a median household income of $70,629 and a median owner-occupied home value of $207,500. The housing stock is mostly owner-occupied, with approximately 21,058 housing units. Dallas County unemployment was 3.3 percent in July 2026, a figure higher than the rate recorded a year earlier. This labor market context reflects the broader economic conditions in the Dallas region during the construction period.

The registration ensures compliance with accessibility standards for the new sidewalks and curb ramps. The replacement of water mains is a critical component of the utility improvements, ensuring reliable service for the residential streets. The project is distinct from larger civic developments in the city, focusing instead on neighborhood-level infrastructure upgrades. The short duration and specific scope make this a targeted improvement for the residents of San Marcus Avenue, Diane Drive, and Barbara Street.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75149 (Mesquite)

One email per change. Unsubscribe in one click. Privacy.

Paving and Utility Improvements for San Marcus, Diane, & Barbara is a Renovation/Alteration project located at San Marcus Ave, Diane Dr, Barbara St, Mesquite, TX 75149 in Mesquite, Texas. The project has an estimated value of $89K covering 1,021 sq ft. City of Mesquite is the property owner. The project was registered with TDLR on June 30, 2026.

Frequently Asked Questions

What is the current status of the construction?

TDLR completed plan review in August 2026. Construction started in May 2026 and is scheduled to finish in September 2026.

How much does the project cost?

The estimated cost is $89,000. This is below the Dallas County median for similar renovation projects but has a higher cost per square foot than the county average.

What specific work is being done?

The project includes street reconstruction, sidewalks, curb ramps, driveways, and replacing water mains along 1,021 linear feet of San Marcus Avenue.

Who is the owner of the project?

The City of Mesquite is the owner of record. Sharlynn L Keys is the registered accessibility specialist.

Is this a public or private project?

This is a public project involving public funds and land. It is also classified as a Federally funded roadway project.

What is Paving and Utility Improvements for San Marcus, Diane, & Barbara?

Paving and Utility Improvements for San Marcus, Diane, & Barbara is a renovation/alteration project at San Marcus Ave, Diane Dr, Barbara St in Mesquite, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Residential street reconstruction included sidewalks, curb ramps, and driveways. The project also includes replacing existing water mains along San Marcus Ave. 1021 LF.

Is Paving and Utility Improvements for San Marcus, Diane, & Barbara open in Mesquite?

Paving and Utility Improvements for San Marcus, Diane, & Barbara was scheduled to finish construction in Sep 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is Paving and Utility Improvements for San Marcus, Diane, & Barbara located?

Paving and Utility Improvements for San Marcus, Diane, & Barbara is located at San Marcus Ave, Diane Dr, Barbara St, Mesquite, TX, 75149, in Dallas County.

Who is the owner or developer of Paving and Utility Improvements for San Marcus, Diane, & Barbara?

City of Mesquite is the property owner/developer of record for Paving and Utility Improvements for San Marcus, Diane, & Barbara, per its TDLR project registration.

How much does Paving and Utility Improvements for San Marcus, Diane, & Barbara cost and how big is it?

Paving and Utility Improvements for San Marcus, Diane, & Barbara has an estimated construction value of $89K and approximately 1,021 square feet (about $87/sqft), based on its TDLR filing.

Scope of Work

Residential street reconstruction included sidewalks, curb ramps, and driveways. The project also includes replacing existing water mains along San Marcus Ave. 1021 LF.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

San Marcus Ave, Diane Dr, Barbara St, Mesquite, TX, 75149

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 75149 (Mesquite)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Mesquite?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.