GNC KK2415-Crossing at
GNC KK2415-Crossing at is a renovation/alteration project at 6445 FM 1463, Katy, in Waller County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jul 2019). The project has an estimated value of $8.0M across about 1,299 sq ft.
๐Project Metrics
TDLR #TABS2019010361Project Closed
Project has been completed and closed
GNC KK2415-Crossing at is a Renovation/Alteration project located at 6445 FM 1463, Katy, TX 77494 in Katy, Texas. The project has an estimated value of $8.0M covering 1,299 sq ft. Lovett Commercial is the property owner. The project was registered with TDLR on April 29, 2019.
โFrequently Asked Questions
What is GNC KK2415-Crossing at?
GNC KK2415-Crossing at is a renovation/alteration project at 6445 FM 1463 in Katy, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior finish out to include paint, electrical, and flooring.
Is GNC KK2415-Crossing at open in Katy?
Construction on GNC KK2415-Crossing at is complete โ TDLR records show the project passed its required accessibility inspection in Jul 2019. The building is finished and very likely open.
Where is GNC KK2415-Crossing at located?
GNC KK2415-Crossing at is located at 6445 FM 1463, Katy, TX, 77494, in Waller County.
Who is the owner or developer of GNC KK2415-Crossing at?
Lovett Commercial is the property owner/developer of record for GNC KK2415-Crossing at, per its TDLR project registration.
How much does GNC KK2415-Crossing at cost and how big is it?
GNC KK2415-Crossing at has an estimated construction value of $8.0M and approximately 1,299 square feet (about $6.12K/sqft), based on its TDLR filing.
๐Scope of Work
Interior finish out to include paint, electrical, and flooring.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Apr 29, 2019
Review Complete
Inspection Complete
Closed
Jul 31, 2019