Waller County, TX Construction Projects

22 Cities · 937 Projects

937
Projects
$4.13B
Total Value
639
New Builds
298
Renovations
22
Cities
59.8M
Sq Ft

What is being built in Waller County, Texas?

Waller County, Texas has 937 construction and development projects on file worth $4.13B — 639 new construction and 298 renovations or remodels, spread across 22 cities and towns. Each record is a real filing from Texas public construction records and names the project, its declared value and the date it was registered.

Which cities in Waller County have the most construction?

The most active cities for construction in Waller County are Katy (83 projects), Brookshire (58 projects), Waller (16 projects), Cypress (12 projects), Prairie View (8 projects). Counts reflect the filings on this page, so a city with a single large development can carry more value than one with more projects.

What new developments are coming to Waller County?

The most recently filed new-construction projects in Waller County are Spec Office Build-Out @ Twinwood DC IV ($750K), America's Best Contacts & Eyeglasses #4180 - Katy ($351K), Spec Office Build-Out @ Twinwood DC V ($750K), Proposed Dental Office ($250K). A new-construction filing is the earliest public signal that something new is being built, usually well before it opens.

Waller County Map

Project locations across the county

Waller County Economy

Federal Reserve Economic Data (FRED)

5.6%↓
Unemployment Rate
31K
Labor Force
Available workers
-1.8%
Unemployment YoY
Improving
Waller County economy: 5.6% unemployment with 31K labor force supporting 937 construction projects worth $4.13B.
85 New Projects in Last 6 Months
$717.0M in new investment
142
Inspection Complete
249
Review Complete
452
Closed
Zabalist / visual intelligence

See the shape of development

Compare project scale, registration dates, and locations across 200 loaded TDLR filings from 937 registered projects. This is the loaded selection, not a measure of every project in the market.

Waller County
Estimated construction value$1.1BSum of 200 shown records with value
Records in view200 / 200Ready to inspect and compare
Largest record’s share25.6%Share of reported value shown
01

Where the value sits

Area = reported value
Select a block to inspect0 without reported value · Smaller records grouped
Waller County

Comparisons use only these 200 records. Missing values are excluded from totals. Recorded value is not revenue or a quality rating.

All Projects

937 TDLR · 0 Site Plans

Showing 20 of 200 listed TDLR filings

Review Complete
$60.0M

BROOKSHIRE SOUTH

34253 WILSON RD, Brookshire, TX 77423

483,881 sqftOct 2, 2026
Review Complete
$350K

La Segarra Phase 2

0 Spanish Gardens Dr., Brookshire, TX 77423

21,000 sqftSep 26, 2026
Registered
$1.6M

Hangar HC700

1900 Cardiff Rd 1904 HC700, Brookshire, TX 77423

13,000 sqftSep 17, 2026
Registered
$12.0M

Alegacy-Coreworks

1200 Alegacy Place, Waller, TX 77484

120,545 sqftSep 14, 2026
Registered
$200K

FLAMINGO ART GALLERY

132 CANE ISLAND PKWY SUITE 111, Katy, TX 77494

1,791 sqftSep 9, 2026

Waller County construction: common questions

How many construction projects are in Waller County, Texas?
Waller County has 937 registered construction projects worth $4.13B, covering 59,819,767 square feet of development. The average project is valued at $4.4M.
What kind of construction is happening in Waller County?
Waller County has 639 new construction projects (68%) and 298 renovation or remodel projects (32%) on file. Work spans commercial, residential, public and mixed-use development.
Who is building in Waller County?
The property owners with the highest declared value on file in Waller County are Royal Independent School District, 4343 Schlipf LLC, Katy ISD. The architecture and design firms appearing most often on Waller County filings are MIII Design, Powers Brown Architecture, PBK Architects.
Where does this Waller County construction data come from?
Every project on this page is a TDLR-registered construction filing from Texas public records, not an estimate or a listing. Each entry keeps the project name, declared value, owner and registration date exactly as filed, which is why a project can appear here months before any visible work starts on site.