Cherry Bekaert
Cherry Bekaert is a renovation/alteration project at 221 West 6th Street level 19, Austin, in Austin County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2019). The project has an estimated value of $1.3M across about 14,177 sq ft.
๐Project Metrics
TDLR #TABS2019012467Project Closed
Project has been completed and closed
Cherry Bekaert is a Renovation/Alteration project located at 221 West 6th Street level 19, Austin, TX 78701 in Austin, Texas. The project has an estimated value of $1.3M covering 14,177 sq ft. 221 W 6TH STREET TX OWNER LLC is the property owner and Abel Design Group is the design firm of record. The project was registered with TDLR on May 24, 2019.
โFrequently Asked Questions
What is Cherry Bekaert?
Cherry Bekaert is a renovation/alteration project at 221 West 6th Street level 19 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Office renovation
Is Cherry Bekaert open in Austin?
Construction on Cherry Bekaert is complete โ TDLR records show the project passed its required accessibility inspection in Dec 2019. The building is finished and very likely open.
Where is Cherry Bekaert located?
Cherry Bekaert is located at 221 West 6th Street level 19, Austin, TX, 78701, in Austin County.
Who is the owner or developer of Cherry Bekaert?
221 W 6TH STREET TX OWNER LLC is the property owner/developer of record for Cherry Bekaert, per its TDLR project registration.
Who is the architect or design firm for Cherry Bekaert?
Abel Design Group is the design firm of record for Cherry Bekaert, according to its TDLR filing.
How much does Cherry Bekaert cost and how big is it?
Cherry Bekaert has an estimated construction value of $1.3M and approximately 14,177 square feet (about $92/sqft), based on its TDLR filing.
๐Scope of Work
Office renovation
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
May 24, 2019
Review Complete
Inspection Complete
Closed
Dec 31, 2019
๐Related Projects
๐คSame Owner
$23.8M total๐๏ธSame Design Firm
$504.3M total๐Related City Permits
Building permits found at or near this location
7 DAY - interior remodel existing office areas - OVA
Remove and replace existing tea and fountain equipment and chiller. Existing C02 to remain. There are no modification to exterior walls parking sidewalks or landscape.
Procore Pan Channel letters
Irrigation for Front and Back yards
Interior remodel existing office entry areas