US 69 Roadway Improvements
US 69 Roadway Improvements is a renovation/alteration project at US 69, Mineola, in Wood County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2020). The project has an estimated value of $1.5M across about 1,068 sq ft.
๐Project Metrics
TDLR #TABS2019016658Project Closed
Project has been completed and closed
US 69 Roadway Improvements is a Renovation/Alteration project located at US 69, Mineola, TX 75773 in Mineola, Texas. The project has an estimated value of $1.5M covering 1,068 sq ft. TxDOT District: Tyler is the property owner and Consor is the design firm of record. The project was registered with TDLR on July 22, 2019.
โFrequently Asked Questions
What is US 69 Roadway Improvements?
US 69 Roadway Improvements is a renovation/alteration project at US 69 in Mineola, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Restoration of existing facility consisting of planing, pavement repair, OCST, overlay, pavement markings, ADA ramps and sidewalks.
Is US 69 Roadway Improvements open in Mineola?
Construction on US 69 Roadway Improvements is complete โ TDLR records show the project passed its required accessibility inspection in May 2020. The building is finished and very likely open.
Where is US 69 Roadway Improvements located?
US 69 Roadway Improvements is located at US 69, Mineola, TX, 75773, in Wood County.
Who is the owner or developer of US 69 Roadway Improvements?
TxDOT District: Tyler is the property owner/developer of record for US 69 Roadway Improvements, per its TDLR project registration.
Who is the architect or design firm for US 69 Roadway Improvements?
Consor is the design firm of record for US 69 Roadway Improvements, according to its TDLR filing.
How much does US 69 Roadway Improvements cost and how big is it?
US 69 Roadway Improvements has an estimated construction value of $1.5M and approximately 1,068 square feet (about $1.41K/sqft), based on its TDLR filing.
๐Scope of Work
Restoration of existing facility consisting of planing, pavement repair, OCST, overlay, pavement markings, ADA ramps and sidewalks.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jul 22, 2019
Review Complete
Inspection Complete
Closed
May 1, 2020