US 271 Phase 3 (CSJ: 3290-02-009, etc.)
US 271 Phase 3 (CSJ: 3290-02-009, etc.) is a new construction project at Various Locations, Gladewater, in Upshur County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Apr 2031. The project has an estimated value of $949K across about 75,000 sq ft.
๐Project Metrics
TDLR #TABS2026011492Review Complete
Design review complete, construction may proceed
US 271 Phase 3 (CSJ: 3290-02-009, etc.) is a New Construction project located at Various Locations, Gladewater, TX 75647 in Gladewater, Texas. The project has an estimated value of $949K covering 75,000 sq ft. TxDOT District: Tyler is the property owner and BGE, Inc. is the design firm of record. The project was registered with TDLR on February 2, 2026.
โFrequently Asked Questions
What is US 271 Phase 3 (CSJ: 3290-02-009, etc.)?
US 271 Phase 3 (CSJ: 3290-02-009, etc.) is a new construction project at Various Locations in Gladewater, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Widen from 2 lanes to 4 lanes with median, shared use path, sidewalks, ADA curb ramps, crosswalks and pedestrian signals.
Is US 271 Phase 3 (CSJ: 3290-02-009, etc.) open in Gladewater?
US 271 Phase 3 (CSJ: 3290-02-009, etc.) is still under construction in Gladewater, TX, with an estimated completion of Apr 2031 according to its TDLR registration.
Where is US 271 Phase 3 (CSJ: 3290-02-009, etc.) located?
US 271 Phase 3 (CSJ: 3290-02-009, etc.) is located at Various Locations, Gladewater, TX, 75647, in Upshur County.
Who is the owner or developer of US 271 Phase 3 (CSJ: 3290-02-009, etc.)?
TxDOT District: Tyler is the property owner/developer of record for US 271 Phase 3 (CSJ: 3290-02-009, etc.), per its TDLR project registration.
Who is the architect or design firm for US 271 Phase 3 (CSJ: 3290-02-009, etc.)?
BGE, Inc. is the design firm of record for US 271 Phase 3 (CSJ: 3290-02-009, etc.), according to its TDLR filing.
How much does US 271 Phase 3 (CSJ: 3290-02-009, etc.) cost and how big is it?
US 271 Phase 3 (CSJ: 3290-02-009, etc.) has an estimated construction value of $949K and approximately 75,000 square feet (about $13/sqft), based on its TDLR filing.
๐Scope of Work
Widen from 2 lanes to 4 lanes with median, shared use path, sidewalks, ADA curb ramps, crosswalks and pedestrian signals.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Feb 2, 2026
Review Complete
Feb 27, 2026
Inspection Complete
Closed
25d
Review duration
๐Related Projects
๐คSame Owner
$4.3M totalProperty Owner
Design Firm
Registered Accessibility Specialist
Explore Area
Find Professionals
Need a contractor for this project?
Browse verified general contractors active in Upshur County
Find General Contractors in Upshur