Cameron Road Water and Wastewater Improvements
Cameron Rd at Broadmoor Dr..., Austin, TX, 78723
Cameron Road Water and Wastewater Improvements is a new construction project at Cameron Rd at Broadmoor Dr..., Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Dec 2027. The project has an estimated value of $10.1M across about 1 sq ft.
- Estimated project value
- $10.1M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 1 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $10111.42K/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1y 3mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
3 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
15 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
456 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Cameron Road Water and Wastewater Improvements
The Cameron Road Water and Wastewater Improvements project involves the installation of new water and wastewater lines along a multi-block stretch of Cameron Road in Austin. The work extends to Broadmoor Drive, Sheridan Avenue, and Clayton Lane, with an estimated cost of $10,111,423. This investment places the project in the top quarter of new construction filings in Travis County, covering associated pavement and sidewalk repairs to restore the street surface.
Project Scope and Design
BGE, Inc. serves as the design firm of record for this new construction effort. The scope specifically targets the intersection of Cameron Road and Broadmoor Drive, as well as the segment of Sheridan Avenue between Reinli Street and Clayton Lane. Additionally, the project covers Clayton Lane from Sheridan Avenue to the alley east of IH-35 and the US-290 frontage road at La Calma Drive. These upgrades are designed to enhance the capacity and reliability of the local water and wastewater systems in the Austin area.
Registered with the Texas Department of Licensing and Regulation in September 2026, the project is in a pending plan review status. Construction is scheduled to begin in October 2026, with completion targeted for December 2027. This timeline reflects a scheduled build window of 456 days, which is longer than the county median of 304 days for similar new construction projects. The extended duration accounts for the complexity of coordinating utility work across multiple intersecting streets and the necessary public land adjustments.
The site is located in ZIP code 78723, a neighborhood with a population of about 37,000 residents. According to U.S. Census American Community Survey estimates, the median household income in this area is $81,986, and the median owner-occupied home value stands at $456,100. The housing stock in the ZIP code is an even mix of owner- and renter-occupied units, indicating a diverse residential community that will rely on the upgraded infrastructure. The project involves public funds and is situated on public land, ensuring that the improvements serve the broader municipal needs of Travis County residents.
Jesus E Lardizabal is the registered accessibility specialist assigned to this filing. The City of Austin has six other TDLR-registered projects totaling $4,265,000, including work at Austin-Bergstrom International Airport and along Rundberg Lane. The Cameron Road Water and Wastewater Improvements is the largest of these concurrent municipal projects, reflecting a significant investment in the city's utility network.
Project Registered
Project has been registered with TDLR and is in pre-construction phase
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78723 (Austin)
One email per change. Unsubscribe in one click. Privacy.
Cameron Road Water and Wastewater Improvements is a New Construction project located at Cameron Rd at Broadmoor Dr..., Austin, TX 78723 in Austin, Texas. The project has an estimated value of $10.1M covering 1 sq ft. City of Austin is the property owner and BGE, Inc. is the design firm of record. The project was registered with TDLR on September 16, 2026.
Frequently Asked Questions
What is the estimated cost of the Cameron Road water improvements?
The estimated cost for this new construction project is $10,111,423. This amount covers the installation of water and wastewater lines as well as the associated pavement and sidewalk repairs along the specified street segments in Austin.
When is the project targeted for completion?
Construction is scheduled to start in October 2026, and the project is targeted for December 2027. The total scheduled build window is 456 days, which is longer than the median duration for similar projects in Travis County.
Which firm is designing this infrastructure project?
BGE, Inc. is the design firm of record for the Cameron Road Water and Wastewater Improvements. They are responsible for the planning and design aspects of the new water and wastewater line installations.
Is the project located in a flood zone?
It is classified as zone X according to the FEMA National Flood Hazard Layer, indicating it is not within the designated flood risk area.
What specific streets are included in the scope of work?
The scope includes Cameron Road at Broadmoor Drive, Sheridan Avenue from Reinli Street to Clayton Lane, Clayton Lane from Sheridan Avenue to the alley east of IH-35, and the US-290 frontage road at La Calma Drive.
What is Cameron Road Water and Wastewater Improvements?
Cameron Road Water and Wastewater Improvements is a new construction project at Cameron Rd at Broadmoor Dr... in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Installation of proposed water and wastewater lines and associated pavement and sidewalk repairs. Cameron Rd at Broadmoor Dr, Sheridan Ave from Reinli St to Clayton Ln, Clayton Ln from Sheridan Ave to alley E of IH35, US290 FR at La Calm…
Is Cameron Road Water and Wastewater Improvements open in Austin?
Cameron Road Water and Wastewater Improvements is still under construction in Austin, TX, with an estimated completion of Dec 2027 according to its TDLR registration.
Where is Cameron Road Water and Wastewater Improvements located?
Cameron Road Water and Wastewater Improvements is located at Cameron Rd at Broadmoor Dr..., Austin, TX, 78723, in Travis County.
Who is the owner or developer of Cameron Road Water and Wastewater Improvements?
City of Austin is the property owner/developer of record for Cameron Road Water and Wastewater Improvements, per its TDLR project registration.
Who is the architect or design firm for Cameron Road Water and Wastewater Improvements?
BGE, Inc. is the design firm of record for Cameron Road Water and Wastewater Improvements, according to its TDLR filing.
How much does Cameron Road Water and Wastewater Improvements cost and how big is it?
Cameron Road Water and Wastewater Improvements has an estimated construction value of $10.1M and approximately 1 square feet (about $10111.42K/sqft), based on its TDLR filing.
Scope of Work
Installation of proposed water and wastewater lines and associated pavement and sidewalk repairs. Cameron Rd at Broadmoor Dr, Sheridan Ave from Reinli St to Clayton Ln, Clayton Ln from Sheridan Ave to alley E of IH35, US290 FR at La Calma Dr,
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
Cameron Rd at Broadmoor Dr..., Austin, TX, 78723
Related Projects
Same Owner
$13.2M totalNearby Projects
Within 1 kmRelated City Permits
Building permits found at or near this location
Change-out HVAC to existing residence only.
Install EVSE in garage
Replace siding on existing single-family residence. No other changes authorized under this permit.
Replace sewer line in the yard replace the sewer line in the yard only.
Replacement of complete existing central heat and air system with or without duct work
Watch all construction in 78723 (Austin)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Austin?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.