Project intelligenceTDLR TABS2026025766New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

City of Bee Cave HSIP Pedestrian Improvements (CSJ: 0914-04-366)

Bee Cave Pkwy & Bee Caves Rd, Bee Cave, TX, 78738

Opening ~Oct 2027Project Registered

City of Bee Cave HSIP Pedestrian Improvements (CSJ: 0914-04-366) is a new construction project at Bee Cave Pkwy & Bee Caves Rd, Bee Cave, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Oct 2027. The project has an estimated value of $1.1M across about 41,148 sq ft.

Estimated project value
$1.1M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
41,148 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$26/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
7 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jul 21, 2026437 days across supplied datesOct 1, 2027

3 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    223 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    214 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About City of Bee Cave HSIP Pedestrian Improvements (CSJ: 0914-04-366)

The City of Bee Cave is preparing to construct new pedestrian infrastructure at the intersection of Bee Cave Parkway and Bee Caves Road under the project name City of Bee Cave HSIP Pedestrian Improvements (CSJ: 0914-04-366). This new construction project involves the installation of signals, crosswalks, sidewalks, and ADA-compliant curb ramps. The work is estimated to cost $1,064,266 and covers an area of 41,148 square feet.

Freese and Nichols serves as the design firm of record for this initiative. The project is registered with TDLR under the name Frank Fonseca, a registered accessibility specialist. The registration was filed in July 2026, with plan review pending. Construction is scheduled to begin in March 2027, and the entire project is targeted for October 2027 completion.

Project Scope and Financial Context

The scope of work focuses on improving pedestrian safety and accessibility at this key intersection in Travis County. The estimated cost of $1,064,266 places the project close to the median estimated cost for new construction filings in the county, which stands at $1,000,000. The calculated cost per square foot is $26, a figure that sits below the county median of $125 per square foot for similar registered projects.

The scheduled build window for this project is 214 days, which is shorter than the county median of 304 days for new construction projects. This timeline reflects a focused effort to complete the signal and sidewalk improvements efficiently. The project involves public funds and is located on public land, ensuring it serves the broader community needs of Bee Cave and the surrounding Austin area.

Freese and Nichols has been involved in six other TDLR-registered projects in the state, totaling nearly $30 million in estimated costs. These projects span various cities, including Dallas, Lubbock, San Angelo, and Burleson. The firm's experience with similar infrastructure work suggests a standardized approach to pedestrian improvement projects across Texas.

Local Context and Area Profile

Bee Cave is a community within Travis County, characterized by a high median household income and a predominantly owner-occupied housing stock. According to U.S. Census estimates for ZIP code 78738, the median household income is $169,911, and the median owner-occupied home value is $754,600. The area has a population of approximately 28,790 residents, indicating a dense suburban environment where pedestrian safety improvements are critical for daily commutes and local travel.

This classification indicates that the area is not subject to significant flood risks, which may influence the engineering requirements for the new sidewalks and curb ramps. The project is part of a broader Highway Safety Improvement Program (HSIP) initiative aimed at reducing pedestrian-related crashes and enhancing accessibility for all road users.

Project Registered

Project has been registered with TDLR and is in pre-construction phase

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78738 (Bee Cave)

One email per change. Unsubscribe in one click. Privacy.

City of Bee Cave HSIP Pedestrian Improvements (CSJ: 0914-04-366) is a New Construction project located at Bee Cave Pkwy & Bee Caves Rd, Bee Cave, TX 78738 in Bee Cave, Texas. The project has an estimated value of $1.1M covering 41,148 sq ft. City of Bee Cave is the property owner and Freese and Nichols is the design firm of record. The project was registered with TDLR on July 21, 2026.

Frequently Asked Questions

When is the Bee Cave pedestrian project expected to finish?

The project is targeted for October 2027 completion, following a scheduled construction start in March 2027. Plan review was pending at the time of the July 2026 registration.

Who is designing the improvements at Bee Cave Parkway and Bee Caves Road?

Freese and Nichols is the design firm of record for this project. Frank Fonseca is the registered accessibility specialist listed in the TDLR filing.

What is the estimated cost of this new construction project?

The estimated cost is $1,064,266. This amount is close to the median cost for new construction projects in Travis County, which is $1,000,000.

What specific improvements are included in the scope of work?

The scope includes constructing signals, crosswalks, sidewalks, and ADA curb ramps to enhance pedestrian safety and accessibility at the intersection.

What is City of Bee Cave HSIP Pedestrian Improvements (CSJ: 0914-04-366)?

City of Bee Cave HSIP Pedestrian Improvements (CSJ: 0914-04-366) is a new construction project at Bee Cave Pkwy & Bee Caves Rd in Bee Cave, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construct signals, crosswalks, sidewalks and ADA curb ramps.

Is City of Bee Cave HSIP Pedestrian Improvements (CSJ: 0914-04-366) open in Bee Cave?

City of Bee Cave HSIP Pedestrian Improvements (CSJ: 0914-04-366) is still under construction in Bee Cave, TX, with an estimated completion of Oct 2027 according to its TDLR registration.

Where is City of Bee Cave HSIP Pedestrian Improvements (CSJ: 0914-04-366) located?

City of Bee Cave HSIP Pedestrian Improvements (CSJ: 0914-04-366) is located at Bee Cave Pkwy & Bee Caves Rd, Bee Cave, TX, 78738, in Travis County.

Who is the owner or developer of City of Bee Cave HSIP Pedestrian Improvements (CSJ: 0914-04-366)?

City of Bee Cave is the property owner/developer of record for City of Bee Cave HSIP Pedestrian Improvements (CSJ: 0914-04-366), per its TDLR project registration.

Who is the architect or design firm for City of Bee Cave HSIP Pedestrian Improvements (CSJ: 0914-04-366)?

Freese and Nichols is the design firm of record for City of Bee Cave HSIP Pedestrian Improvements (CSJ: 0914-04-366), according to its TDLR filing.

How much does City of Bee Cave HSIP Pedestrian Improvements (CSJ: 0914-04-366) cost and how big is it?

City of Bee Cave HSIP Pedestrian Improvements (CSJ: 0914-04-366) has an estimated construction value of $1.1M and approximately 41,148 square feet (about $26/sqft), based on its TDLR filing.

Scope of Work

Construct signals, crosswalks, sidewalks and ADA curb ramps.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

Bee Cave Pkwy & Bee Caves Rd, Bee Cave, TX, 78738

Loading location map…
30.28786, -97.75614

Related City Permits

Building permits found at or near this location

2301 WINDSOR RD
Same location

Change-out HVAC to existing residence only.

FinalMechanical PermitRemodelAug 2013
View Details
2013-086270 MP
Petrocelli Services Inc.
2305 WINDSOR RD
107 ft away

Install EVSE in garage

FinalElectrical PermitSpecial Inspections ProgramMay 2021
View Details
2021-062668 EP
Grayzer Electric LLC
2215 WINDSOR RD
128 ft away

Replace siding on existing single-family residence. No other changes authorized under this permit.

FinalBuilding PermitRepairApr 2017
$6K
View Details
2017-039727 BP
Home Depot USA Inc
2302 WINDSOR RD
144 ft away

Replace sewer line in the yard replace the sewer line in the yard only.

WithdrawnPlumbing PermitRepairOct 2023
View Details
2023-127986 PP
Service Wizard
2302 WINDSOR RD
144 ft away

Replacement of complete existing central heat and air system with or without duct work

ExpiredMechanical PermitChange OutSep 2019
View Details
2019-181713 MP
All Year Heating & Cooling

Watch all construction in 78738 (Bee Cave)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Bee Cave?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.