Total Pro Flooring is a additions to existing building project at 900 E. Old Settlers Blvd., Building 1 Suite 130, Round Rock, in Williamson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2019). The project has an estimated value of $275K across about 8,480 sq ft.
Project has been completed and closed
Total Pro Flooring is a Additions to Existing Building project located at 900 E. Old Settlers Blvd., Building 1 Suite 130, Round Rock, TX 78664 in Round Rock, Texas. The project has an estimated value of $275K covering 8,480 sq ft. East Group Properties is the property owner and Method Architecture, PLLC is the design firm of record. The project was registered with TDLR on September 11, 2019.
Total Pro Flooring is a additions to existing building project at 900 E. Old Settlers Blvd., Building 1 Suite 130 in Round Rock, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior buildout in existing building
Construction on Total Pro Flooring is complete โ TDLR records show the project passed its required accessibility inspection in Dec 2019. The building is finished and very likely open.
Total Pro Flooring is located at 900 E. Old Settlers Blvd., Building 1 Suite 130, Round Rock, TX, 78664, in Williamson County.
East Group Properties is the property owner/developer of record for Total Pro Flooring, per its TDLR project registration.
Method Architecture, PLLC is the design firm of record for Total Pro Flooring, according to its TDLR filing.
Total Pro Flooring has an estimated construction value of $275K and approximately 8,480 square feet (about $32/sqft), based on its TDLR filing.
Interior buildout in existing building
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Sep 11, 2019
Review Complete
Inspection Complete
Closed
Dec 26, 2019
Building permits found at or near this location
7 DAY - INTERIOR REMODEL OF OFFICE SPACE. MOSTLY ELECTRICAL AND MECHANICAL AT EXISTING OFFICE SPACE - OVA
Replacement of two existing boilers within the Palmer Events Center
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 2.5 Ton Vertical Heat Pump System
Express: Foundation repair Revision-plumbing work (repair sewer line underneath home)
Installing 4 Single Port EV Charging Stations in the Exterior Parking Lot a Multi-Family Apartment Complex