Funding type
This project is privately funded, on private land for private use.
Mustang #300 - Fellers TI
1200 Mustang Drive #300, Dfw Airport, TX, 76051
Mustang #300 - Fellers TI is a new construction project at 1200 Mustang Drive #300, Dfw Airport, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Feb 2026). The project has an estimated value of $96K across about 6,000 sq ft.
- Estimated project value
- $96K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 6,000 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $16/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 4 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
5 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
27 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
122 days after the preceding date shown.
Source: TDLR filing
View source recordProject closed · TDLR filing
The project record was closed in TDLR.
42 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Mustang #300 - Fellers TI
TDLR closed the project file in February 2026, marking the end of the accessibility review process for this construction. The project, identified as Mustang #300 - Fellers TI, involved interior improvements to the DFW Global Logistics Center, Building B, located at 1200 Mustang Drive #300 in Dfw Airport, TX 76051. The scope consisted of adding two new offices and a break room within an existing 6,000 sq ft office space. This work was classified as new construction with an estimated cost of $96,000.
Project Details and Stakeholders
East Group Properties served as the owner and developer of record for this privately funded project on private land. RGA Architects Inc. was the design firm of record, and Clinton L Coultas acted as the registered accessibility specialist. The project was registered with TDLR in August 2025, with plan review completed in the same month. Construction was scheduled to begin in September 2025, with a planned completion date of January 2026. The TDLR status is now Project Closed, confirming the administrative conclusion of the review period.
The financial profile of this project is distinct from typical new construction filings in Tarrant County. With an estimated cost of $96,000, it falls below the county median of $800,000 for similar filings. The calculated cost of $16 per sq ft is also below the county median of $120 per sq ft. The scheduled build window of 122 days was shorter than the county median of 214 days. These figures place the project in the lower range of cost and duration compared to the 8,827 new construction filings analyzed in the region.
East Group Properties has a history of similar projects in the area, including six other TDLR-registered projects totaling $12,445,000. Notable examples include the 25084 - Make Ready - TI in Grapevine and the DFW Global Logistics Center BLDG. C in Dfw Airport. RGA Architects Inc. has also been involved in larger projects, such as Westport 41 and Westport 42 in Haslet, which are significantly higher in value. The local area profile for ZIP code 76051 indicates a population of about 50,514 and a median household income of $111,193, according to U.S. Census ACS 2023 five-year estimates.
The completion of this project reflects a specific, targeted improvement to existing office infrastructure rather than a large-scale new build. The focus on adding functional spaces like offices and a break room within a defined square footage aligns with the project's modest budget and timeline. The closure of the TDLR file in February 2026 signifies that all required accessibility reviews were finalized according to the registered schedule.
Project Closed
Project has been completed and closed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 76051 (Dfw Airport)
One email per change. Unsubscribe in one click. Privacy.
Mustang #300 - Fellers TI is a New Construction project located at 1200 Mustang Drive #300, Dfw Airport, TX 76051 in Dfw Airport, Texas. The project has an estimated value of $96K covering 6,000 sq ft. East Group Properties is the property owner and RGA Architects Inc. is the design firm of record. The project was registered with TDLR on August 19, 2025.
Frequently Asked Questions
What work was done at Mustang #300?
The project involved interior improvements to an existing 6,000 sq ft office. The scope included adding two new offices and a break room within the DFW Global Logistics Center, Building B.
Who is the owner of this project?
East Group Properties is listed as the owner and developer of record. The project was privately funded on private land for private use.
What is the current status of the project?
TDLR closed the project file in February 2026. The status is Project Closed, indicating the accessibility review process has ended.
How much did the project cost?
The estimated cost was $96,000. This is below the Tarrant County median for new construction filings, which is $800,000.
When was the project completed?
The filing listed a completion date of January 2026. TDLR closed the project file in February 2026, confirming the end of the review process.
What is Mustang #300 - Fellers TI?
Mustang #300 - Fellers TI is a new construction project at 1200 Mustang Drive #300 in Dfw Airport, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior improvements in the existing 6,000 square foot office of the DFW Global Logistics Center Building B consist of adding two new offices and a break room.
Is Mustang #300 - Fellers TI open in Dfw Airport?
Construction on Mustang #300 - Fellers TI is complete — TDLR records show the project passed its required accessibility inspection in Feb 2026. The building is finished and very likely open.
Where is Mustang #300 - Fellers TI located?
Mustang #300 - Fellers TI is located at 1200 Mustang Drive #300, Dfw Airport, TX, 76051, in Tarrant County.
Who is the owner or developer of Mustang #300 - Fellers TI?
East Group Properties is the property owner/developer of record for Mustang #300 - Fellers TI, per its TDLR project registration.
Who is the architect or design firm for Mustang #300 - Fellers TI?
RGA Architects Inc. is the design firm of record for Mustang #300 - Fellers TI, according to its TDLR filing.
How much does Mustang #300 - Fellers TI cost and how big is it?
Mustang #300 - Fellers TI has an estimated construction value of $96K and approximately 6,000 square feet (about $16/sqft), based on its TDLR filing.
Scope of Work
Interior improvements in the existing 6,000 square foot office of the DFW Global Logistics Center Building B consist of adding two new offices and a break room.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
1200 Mustang Drive #300, Dfw Airport, TX, 76051
Related Projects
Same Owner
$705.4M totalWatch all construction in 76051 (Dfw Airport)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Dfw Airport?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.