Funding type
This project is privately funded, on private land for private use.
23023 - Cargo Center 1 TI - #400
1639 W. 23rd Street #400, Dfw Airport, TX, 75261
23023 - Cargo Center 1 TI - #400 is a new construction project at 1639 W. 23rd Street #400, Dfw Airport, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Dec 2026. The project has an estimated value of $123K across about 4,136 sq ft.
- Estimated project value
- $123K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 4,136 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $30/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 3 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
3 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
7 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
91 days after the preceding date shown.
Source: TDLR filing
View source record
📰About 23023 - Cargo Center 1 TI - #400
23023 - Cargo Center 1 TI - #400 is a new construction project located at 1639 W. 23rd Street #400 in Dfw Airport, Dallas County. The work involves modifications to the existing elevator and equipment inside the existing Cargo Center 1 shell building. The project covers 4,136 sq ft with an estimated cost of $123,000.
The City of Dallas/DFW Airport Division is the owner of record for this project. RGA Architects Inc. serves as the design firm. Clinton L Coultas is the registered accessibility specialist. The project is privately funded on private land for private use. It is registered with TDLR in September 2026 and is targeted for December 2026.
Construction Scope and Cost
The scope of work is specific to the interior modifications of Suite #400. The estimated cost of $123,000 translates to $30 per square foot. This figure is below the county median of $125 per square foot for new construction filings in Dallas County. The total cost is also below the county median of $950,000 for similar projects.
The scheduled build window is 91 days, which is shorter than the county median of 243 days for new construction projects. This status affects insurance and construction planning but does not alter the structural scope described in the filing.
Project Context and Ownership
The City of Dallas/DFW Airport Division has six other TDLR-registered projects totaling $3,055,000. These include work on Terminal C and Terminal D at Dfw Airport, as well as a make-ready project in Dallas. RGA Architects Inc. has six other registered projects totaling $58,832,142, including large-scale developments in Haslet and McKinney.
Dallas County unemployment was 3.3 percent in July 2026, higher than a year earlier. This labor market context may influence construction timelines and workforce availability for the project. The project remains in the plan review stage, with completion targeted for December 2026.
All facts presented are derived from the TDLR registration and public records. No additional details regarding business operations, opening dates, or service availability are provided in the filing. The project status is strictly construction-related and does not indicate commercial readiness.
Project Registered
Project has been registered with TDLR and is in pre-construction phase
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 75261 (Dfw Airport)
One email per change. Unsubscribe in one click. Privacy.
23023 - Cargo Center 1 TI - #400 is a New Construction project located at 1639 W. 23rd Street #400, Dfw Airport, TX 75261 in Dfw Airport, Texas. The project has an estimated value of $123K covering 4,136 sq ft. City of Dallas/DFW Airport Division is the property owner and RGA Architects Inc. is the design firm of record. The project was registered with TDLR on September 24, 2026.
Frequently Asked Questions
What is the exact address of the project?
The project is located at 1639 W. 23rd Street #400, Dfw Airport, TX 75261.
What is the estimated cost and size?
The estimated cost is $123,000 for 4,136 sq ft, which is $30 per square foot.
Is the business open to the public?
The TDLR record only covers construction status. It does not indicate if the business is open or operating. Completion is targeted for December 2026.
Who is the design firm?
RGA Architects Inc. is the design firm of record for this project.
What is 23023 - Cargo Center 1 TI - #400?
23023 - Cargo Center 1 TI - #400 is a new construction project at 1639 W. 23rd Street #400 in Dfw Airport, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: The project consists of modifications to the existing elevator and equipment inside the existing Cargo Center 1 shell building Suite #400 at DFW Airport.
Is 23023 - Cargo Center 1 TI - #400 open in Dfw Airport?
23023 - Cargo Center 1 TI - #400 is still under construction in Dfw Airport, TX, with an estimated completion of Dec 2026 according to its TDLR registration.
Where is 23023 - Cargo Center 1 TI - #400 located?
23023 - Cargo Center 1 TI - #400 is located at 1639 W. 23rd Street #400, Dfw Airport, TX, 75261, in Dallas County.
Who is the owner or developer of 23023 - Cargo Center 1 TI - #400?
City of Dallas/DFW Airport Division is the property owner/developer of record for 23023 - Cargo Center 1 TI - #400, per its TDLR project registration.
Who is the architect or design firm for 23023 - Cargo Center 1 TI - #400?
RGA Architects Inc. is the design firm of record for 23023 - Cargo Center 1 TI - #400, according to its TDLR filing.
How much does 23023 - Cargo Center 1 TI - #400 cost and how big is it?
23023 - Cargo Center 1 TI - #400 has an estimated construction value of $123K and approximately 4,136 square feet (about $30/sqft), based on its TDLR filing.
Scope of Work
The project consists of modifications to the existing elevator and equipment inside the existing Cargo Center 1 shell building Suite #400 at DFW Airport.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
1639 W. 23rd Street #400, Dfw Airport, TX, 75261
Related Projects
Same Owner
$2.3M totalSame Design Firm
$38.0M totalNearby Projects
Within 1 kmWatch all construction in 75261 (Dfw Airport)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Dfw Airport?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.