Co-Op District
๐Project Metrics
TDLR #TABS2020001550Inspection Complete
Final inspection completed, awaiting project closure
๐Scope of Work
construction of a 135 space surface parking lot.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$2.9M total๐๏ธSame Design Firm
$1.9M total๐Related City Permits
Building permits found at or near this location
Interior remodel portions of doors infilled interior non load bearing walls in master bath were removed and new walls installed load bearing wall between kitchen and family room removed and replaced (full scope of structural verification report)
*Retroactive* addition of existing SFR permit pool and deck addition (pool 450 sq. ft. and deck addition 80 sq. ft.)
Addition - Addition to Mater Bed/Bathroom - Interior remodel - New rear Deck(Please note this deck is to be constructed out of TIMBERTECH VINTAGE remove existing driveway apron ADVANCED PVC CLASS A
Addition - Addition to Mater Bed/Bathroom - Interior remodel - New rear Deck(Please note this deck is to be constructed out of TIMBERTECH VINTAGE remove existing driveway apron ADVANCED PVC CLASS A
Construct new driveway approach of 16 FT. Driveway approach is from the alley.